Permit: DP17-0007
Permit Details
Apply Date:
01/10/2017
Applicant:
David Gary Gerovac
Description:
SITE/GRADING - Storacle Point Castro.
Permit Reviews
Permit Number - DP17-0007
Permit Status: Complete
Permit Description: SITE/GRADING - Storacle Point Castro.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/10/2017 | DEV PKG - OK TO SUBMIT | 01/10/2017 | COMPLETED |
| 01/10/2017 | DEV PKG | 02/17/2017 | COMPLETED |
| 02/17/2017 | DEV PKG - RESUBMITTAL | 03/06/2017 | COMPLETED |
| 03/06/2017 | DEV PKG - RESUBMITTAL | 11/22/2017 | COMPLETED |
| 06/12/2019 | REVISION - - 2ND | 07/10/2019 | COMPLETED |
| 07/12/2019 | REVISION - - 2ND | 07/25/2019 | COMPLETED |
| 11/22/2017 | DEV PKG - REVISION | 03/28/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0007
Permit Description: SITE/GRADING - Storacle Point Castro.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/26/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - preconstruction meeting with Greg from Canyon building and design. No SWPPP is required for the site. However I did tell Greg that he is responsible to clean any track out onto Castro Avenue and I also asked him to clean up the spilled concrete dumped onto the site with no containment.} ; {Activity date: 02/15/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Please schedule for a preconstruction meeting under this permit. I met with Greg from Chestnut and Vance the designer.} | |
| 05/16/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I walk the site with Greg from Canyon builders.} | |
| 05/16/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I walk the site with Greg from Canyon builders.} ; {Activity date: 04/29/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Contractor is working on site entrance} ; {Activity date: 04/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is notable track out onto Castro, contractor is grading site and performing work in the right of way} ; {Activity date: 04/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - There is notable track out onto Castro, contractor is grading site and performing work in the right of way } ; {Activity date: 04/12/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is no double track out onto Castro.} ; {Activity date: 02/26/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is track out dirt onto Castro, because there are no controls installed. There has been concrete dumped onto the site with no form of containment. I asked Greg with Canyon builders to clean up these areas.} ; {Activity date: 02/15/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - This project is less than 1 acre however there is track out onto the public roadway that needs to be cleaned. There is no track out controls in place, Also please protect the manhole from stormwater and mud.} |
|
| 05/16/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I walk the site with Greg from Canyon builders.} | |
| 05/16/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I walk the site with Greg from Canyon builders.} | |
| 05/16/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I walk the site with Greg from Canyon builders.} | |
| 05/30/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 05/30/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/16/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Inspector has no issues that would prevent a TCO. Complete the work on the DP plan. Depress the landscaping areas, stake the trees, provide a plan revision to the changes made for the accessible parking, and sidewalk ramp as installed. Correct potential tripping hazard at the ramp into the parking area at the abandon accessible space.} | |
| 10/14/2019 | ENGR Engineering Final | Passed | {Activity date: 10/14/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/30/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Pending city of proved revision of deletion of third accessible parking space and accessible ramp leading into loading area and parking lot. Installed as shown on unapproved revision} ; {Activity date: 05/16/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Inspector has no issues that would prevent a TCO. Complete the work on the DP plan. Depress the landscaping areas, stake the trees, provide a plan revision to the changes made for the accessible parking, and sidewalk ramp as installed. Correct potential tripping hazard at the ramp into the parking area at the abandon accessible space.} ; {Activity date: 04/29/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
| 10/14/2019 | ENGR Grading Final | Passed | {Activity date: 10/14/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } |