Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/26/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by CBELL1 - preconstruction meeting with Greg from Canyon building and design. No SWPPP is required for the site. However I did tell Greg that he is responsible to clean any track out onto Castro Avenue and I also asked him to clean up the spilled concrete dumped onto the site with no containment. |
| 02/15/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Please schedule for a preconstruction meeting under this permit. I met with Greg from Chestnut and Vance the designer. |