Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 05/16/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Approved |
Entered by DMERANZ1 - I walk the site with Greg from Canyon builders. |
| 04/29/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - Contractor is working on site entrance |
| 04/18/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - There is notable track out onto Castro, contractor is grading site and performing work in the right of way |
| 04/16/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CMURPHY1 - There is notable track out onto Castro, contractor is grading site and performing work in the right of way
|
| 04/12/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - There is no double track out onto Castro. |
| 02/26/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Denied |
Entered by CBELL1 - There is track out dirt onto Castro, because there are no controls installed. There has been concrete dumped onto the site with no form of containment. I asked Greg with Canyon builders to clean up these areas. |
| 02/15/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Denied |
Entered by CBELL1 - This project is less than 1 acre however there is track out onto the public roadway that needs to be cleaned. There is no track out controls in place, Also please protect the manhole from stormwater and mud. |