Permit: DP16-0156
Permit Details
Apply Date:
08/30/2016
Applicant:
Linda Thompson
Description:
SITE/GRADING/SWPPP - U-Haul.1st Revision approved 12/24/2018 - sheets 1, 2, 4, 5, 8, 9, 13, 15-19,
Permit Reviews
Permit Number - DP16-0156
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - U-Haul.1st Revision approved 12/24/2018 - sheets 1, 2, 4, 5, 8, 9, 13, 15-19,
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/25/2017 | DEV PKG - RESUBMITTAL | 10/02/2018 | COMPLETED |
08/30/2016 | DEV PKG - OK TO SUBMIT | 08/30/2016 | COMPLETED |
08/30/2016 | DEV PKG | 09/27/2016 | COMPLETED |
10/02/2018 | DEV PKG - REVISION | 10/02/2018 | COMPLETED |
10/02/2018 | DEV PKG - REVISION | 11/06/2018 | COMPLETED |
10/09/2020 | REVISION - - 2ND | 10/23/2020 | COMPLETED |
11/19/2020 | REVISION - - 2ND | 01/12/2021 | COMPLETED |
11/21/2016 | DEV PKG - RESUBMITTAL | 01/25/2017 | COMPLETED |
11/27/2018 | DEV PKG - REVISION | 01/08/2019 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0156
Permit Description: SITE/GRADING/SWPPP - U-Haul.1st Revision approved 12/24/2018 - sheets 1, 2, 4, 5, 8, 9, 13, 15-19,
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/15/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/15/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Carlos with a 5 design and construction. SW3 inspections subcontracting SWPPP installations. Carlos claims that no one showed up for the previously scheduled inspection. Project is well underway. Post site address and SWPpp signage as required Correct waddle nd trackout protections Schedule stormwater inspections biweekly Use grading intermediate for all site store water systems including dry well} ; {Activity date: 04/24/2019; Status: Cancelled; Inspector: DROBERTS; Comment: Entered by CBELL1 - Was held by the contractor this morning at 9 AM we were unavailable to be there at that time will have to be rescheduled at a later date} |
|
06/03/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/03/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 01/23/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/23/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Trees planted and staked} | |
06/03/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 06/03/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } | |
06/03/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 06/03/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - continued temporary fencing partially blocking the sidewalk.} ; {Activity date: 03/19/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - No issues or concerns at this time.} ; {Activity date: 01/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Some track out to be noted.} ; {Activity date: 12/19/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Minor track out} ; {Activity date: 09/30/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues.} ; {Activity date: 08/20/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no issues at this time and track out protection has been corrected.} ; {Activity date: 08/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Correct waddle Placments and trackout protections} | |
06/03/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/03/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } | |
06/03/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 06/03/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } | |
06/09/2020 | ENGR Grading Final | Passed | {Activity date: 06/09/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 09/05/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Masonry wall at detention basin, as shown, first lift, ok} ; {Activity date: 08/20/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Footing for site perimeter block wall needs to be inspected by the building inspector as there is no detail for this footing on the development package plan. Note, provisions have been made in the layout to allow for the drainage openings required.} | |
06/09/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/09/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 06/03/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Provide NOT from State. FaceTime inspection with Mark and Carlos} |
|
07/14/2020 | COT - FCON - Fire - Final | Passed | {Activity date: 07/14/2020; Status: Approved; Inspector: jvincent; Comment: Entered by JVINCEN1 - Approved by HBrown on 01/25/17 based on the response letter. Response is below: Per the discussion with and email sent to Ken Brouillette on January 12th, we are proposing one fire hydrant between the two proposed driveways that is central to the two proposed building. The proposed hydrant will provide adequate coverage for both buildings.} ; {Activity date: 06/04/2020; Status: Denied; Inspector: jvincent; Comment: Entered by JVINCEN1 - Called A5 design to discuss why there was a fire final on their DP. Was referred to Carlos (super) 609-3000. Left a message, no call back.} |
|
07/15/2020 | ENGR Engineering Final | Passed | {Activity date: 07/15/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/10/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - PARTIAL AT THIS TIME. PROVIDE CLOSEOUT DOCUMENTATION 1) CERTIFICATION LETTER AND APPROVED REVISED DRAWINGS FOR ANY CHANGES FROM THE ENGINEER OF RECORD. 2) A COPY OF THE NOTICE OF TERMINATION LETTER FROM ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY 3) THERE ARE DISTURBED / EXPOSED SOILS NOTED ON THIS SITE DURING THIS INSPECTION. THESE AREAS ARE TO BE EITHER HYDRO SEEDED, OR COVERED WITH DECOMPOSED GRANITE AS REQUIRED BY THE CITY OF TUCSON’S TECHNICAL STANDARDS. IF THERE ARE ANY QUESTIONS PLEASE CONTACT DAVID ROBERTS AT (520) 349-7643 OR BY EMAIL AT David.Roberts@tucsonaz.gov. } ; {Activity date: 07/09/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Spoke with Ontavio with a five construction and explain to him the remaining corrections required for final approval} ; {Activity date: 06/09/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. NO I received. Stabilize all remaining areas of bare dirt within the site excluding the bottom of the basin.} ; {Activity date: 06/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Courtesy inspection for Armando with A –5 construction. Remove debris and stabilize dirt area at the north end of the basin. Remove stormwater controls from drywell grates. Complete the work in the north east portion of the site.} ; {Activity date: 06/04/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Remove the remaining dirt and debris north of basin, Provide stabilization at this location. Remove stormwater controls at dry well. Complete work at North East portion of site. } ; {Activity date: 06/04/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Remove the remaining dirt and debris north of basin, Provide stabilization at this location. Remove stormwater controls at dry well. Complete work at North East portion of site.} ; {Activity date: 06/03/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Provide NOT from State. FaceTime inspection with Mark and Carlos} |