Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/15/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by DMERANZ1 - Carlos with a 5 design and construction. SW3 inspections subcontracting SWPPP installations.
Carlos claims that no one showed up for the previously scheduled inspection. Project is well underway.
Post site address and SWPpp signage as required
Correct waddle nd trackout protections
Schedule stormwater inspections biweekly
Use grading intermediate for all site store water systems including dry well |
| 04/24/2019 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Cancelled |
Entered by CBELL1 - Was held by the contractor this morning at 9 AM we were unavailable to be there at that time will have to be rescheduled at a later date |