Date Description Inspector Results Comments
06/03/2020 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 -
06/03/2020 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 -
04/23/2020 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THIS SITE NEEDS TO BE CHECKED AND INSPECTED TO DETERMINE IF IT IS READY TO BE CLOSED.
06/03/2020 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 -
05/18/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued.Contractor has completed paving in right of way locations.
05/08/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Contractor has installed asphalt and is installing interior fencing and canopies
03/19/2020 ENGR Grading Final BBENEDON Continued Entered by SFLORES2 - AB installed, ready for asphalt.
01/23/2020 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - A five design and construction Carlos is bringing dirt onto the site, he’s getting ready to start a new building and large dry well.
12/19/2019 ENGR Grading Final BBENEDON Continued Entered by SFLORES2 - Contractor installing site utilities
09/30/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Installing curbs. I informed Carlos that the sidewalks along Benson highway are within the right of way and require a separate permit and inspection from transportation.
09/04/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Met with Carlos on site. Contractor is installing block perimeter wall at detention Basin Location, preparing to excavate for the site sewer and installing building wall panels.
08/15/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Have site perimeter fencing inspected By building Provide drainage openings as specified.
06/09/2020 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 -
09/05/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Masonry wall at detention basin, as shown, first lift, ok
08/20/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Footing for site perimeter block wall needs to be inspected by the building inspector as there is no detail for this footing on the development package plan. Note, provisions have been made in the layout to allow for the drainage openings required.