Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP16-0156
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/10/2020 | ENGR Engineering Final | DROBERTS | Approved | Entered by JSCHNEI2 - APPROVED AT THIS TIME |
07/10/2020 | ENGR Engineering Final | DROBERTS | Approved | Entered by JSCHNEI2 - APPROVED PENDING ALL OTHER INSPECTIONS |
07/09/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Spoke with Ontavio with a five construction and explain to him the remaining correction required for final approval Including removal of remaining stormwater controls and crown staples |
06/03/2020 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Provide NOT from State. FaceTime inspection with Mark and Carlos |
07/15/2020 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
07/10/2020 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by JSCHNEI2 - PARTIAL AT THIS TIME. PROVIDE CLOSEOUT DOCUMENTATION 1) CERTIFICATION LETTER AND APPROVED REVISED DRAWINGS FOR ANY CHANGES FROM THE ENGINEER OF RECORD. 2) A COPY OF THE NOTICE OF TERMINATION LETTER FROM ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY 3) THERE ARE DISTURBED / EXPOSED SOILS NOTED ON THIS SITE DURING THIS INSPECTION. THESE AREAS ARE TO BE EITHER HYDRO SEEDED, OR COVERED WITH DECOMPOSED GRANITE AS REQUIRED BY THE CITY OF TUCSON’S TECHNICAL STANDARDS. IF THERE ARE ANY QUESTIONS PLEASE CONTACT DAVID ROBERTS AT (520) 349-7643 OR BY EMAIL AT David.Roberts@tucsonaz.gov. |
07/09/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Spoke with Ontavio with a five construction and explain to him the remaining corrections required for final approval |
06/09/2020 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. NO I received. Stabilize all remaining areas of bare dirt within the site excluding the bottom of the basin. |
06/08/2020 | ENGR Engineering Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Courtesy inspection for Armando with A -5 construction. Remove debris and stabilize dirt area at the north end of the basin. Remove stormwater controls from drywell grates. Complete the work in the north east portion of the site. |
06/04/2020 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Remove the remaining dirt and debris north of basin, Provide stabilization at this location. Remove stormwater controls at dry well. Complete work at North East portion of site. |
06/04/2020 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Remove the remaining dirt and debris north of basin, Provide stabilization at this location. Remove stormwater controls at dry well. Complete work at North East portion of site. |
06/03/2020 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Provide NOT from State. FaceTime inspection with Mark and Carlos |