Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 06/03/2020 |
SITE - Stormwater Follow-up
|
BBENEDON |
Approved |
Entered by RSALDAT1 - |
| 05/18/2020 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by RSALDAT1 - continued temporary fencing partially blocking the sidewalk. |
| 03/19/2020 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by SFLORES2 - No issues or concerns at this time. |
| 01/23/2020 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - Some track out to be noted. |
| 12/19/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by SFLORES2 - Minor track out |
| 09/30/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - No issues. |
| 08/20/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - There are no issues at this time and track out protection has been corrected. |
| 08/15/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - Correct waddle Placments and trackout protections |