Permit Details

Status:
Complete
Type:
Development Package
Address:
950 N TYNDALL AV
Address NEW:
950 N TYNDALL AV
Apply Date:
08/23/2016
Applicant:
Tri Miller
Description:
SITE/GRADING/SWPPP - STERLING - TYNDALL AVENUE (MGD)Originally approved: 12/27/2016 (25 pages)

Permit Reviews

Permit Number - DP16-0151
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - STERLING - TYNDALL AVENUE (MGD)Originally approved: 12/27/2016 (25 pages)
Start Date Submittal Complete Date Status  
08/23/2016 DEV PKG - OK TO SUBMIT 08/23/2016 COMPLETED Review Details
08/23/2016 DEV PKG 10/04/2016 COMPLETED Review Details
10/28/2016 DEV PKG - RESUBMITTAL 12/02/2016 COMPLETED Review Details
12/15/2016 DEV PKG - RESUBMITTAL 05/11/2017 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP16-0151
Permite Description: SITE/GRADING/SWPPP - STERLING - TYNDALL AVENUE (MGD)Originally approved: 12/27/2016 (25 pages)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/24/2019 PDSD Site/Engineering Division - NPPO N/A Not Ready {Activity date: 09/24/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/24/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Sam cancel inspection will reschedule.}

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0151
Permit Description: SITE/GRADING/SWPPP - STERLING - TYNDALL AVENUE (MGD)Originally approved: 12/27/2016 (25 pages)
Total Completed Inspections - 8
Date Description Inspector Results Comments
09/14/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS AT PERIMETER PER YOUR SWPPP
2) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS
3) POST A COPY OF YOUR NOI AT THE SITE
4) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM
5) PROVIDE A PERMIT CARD SHOWING REQUIRED INSPECTIONS
6) RE-ESTABLISH A STABILIZED CONSTRUCTION ENTRANCE AND MAINTAIN IT.
7) INSTALL A CONCRETE WASH OUT ON SITE WHEN APPLICABLE
8) CALL FOR RE-INSPECTION FOR ANY SITE CONCERNS/PROBLEMS}
09/24/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 09/24/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/26/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/26/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/20/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by VFLORES1 - COMPLETE THE INSTALLATION OF ALL REQUIRED TREES, SHRUBS, AND PLANTS ON THIS SITE THAT HAVE NOT BEEN INSTALLED AT THIS TIME. THIS WILL INCLUDE THE INSTALLATION OF VEGETATIVE MATERIAL AND GROUND COVER, AND IRRIGATION AS NEEDED}
09/26/2019 ENGR Engineering Final Passed {Activity date: 09/26/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/20/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by VFLORES1 - COMPLETE ALL WORK NOTED ABOVE PRIOR TO SCHEDULING ANOTHER FINAL GRADING INSPECTION. ONCE ALL WORK PROVIDE THE DEPARTMENT WITH THE REQUIRED CLOSEOUT DOCUMENTATION PRIOR TO SCHEDULING THE INSPECTION, THIS WILL INCLUDE APPROVED REVISED DRAWINGS, A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, TO BE USED DURING THE INSPECTION.}
09/26/2019 SITE - Stormwater Follow-up Passed {Activity date: 09/26/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/05/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I WALKED THE SITE TO SEE WHAT TYPE OF WORK IS HAPPENING AND IF THERE ARE ANY VIOLATIONS OF THE SWPPP AT THIS TIME, NONE NOTED AT THIS TIME.
I MET WITH FRED TURK THE SUPERINTENDENT FOR THE DEVELOPER AND DISCUSSED THE DAY TO DAY OPERATIONS AND WHAT THEY NEED TO DO IN THE FUTURE. I HAVE REMINDED THEM THAT THEY NEED TO BE SCHEDULING REGULAR INSPECTIONS FOR THIS PERMIT AT LEAST ONCE A MONTH TO COVER THE STORMWATER REQUIREMENTS. HE WILL BE DOING THIS IN THE FUTURE AND WILL ALSO SCHEDULE OTHER INSPECTIONS FOR THIS PERMIT AS NEEDED. MOST OF THE WORK ON THIS SITE IS WITHIN THE REALMS OF THE BUILDING COLUMNS AND FLOORS, NOTHING HAPPENING OUTSIDE OF THE FOOT PRINT FOR THE BUILDING.}
09/26/2019 ENGR Grading Final Passed {Activity date: 09/26/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/26/2019 SITE - Stormwater Final Inspection Passed {Activity date: 09/26/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/20/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by VFLORES1 - COMPLETE ALL SITE WORK AS NEEDED, PROVIDE US WITH THE REVISED DRAWINGS NOTING AND APPROVING ALL CHANGES MADE TO THIS SITE. PROVIDE TH CITY OF TUCSON WITH A COPY OF THE NOTICE OF TERMINATION FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY. VERIFY THAT ALL STORMWATER MATERIALS HAVE BEEN REMOVED FROM THIS SITE.
}
09/26/2019 COT - ENGR - Signage Final Passed {Activity date: 09/26/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/24/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Sam cancel inspection will reschedule.}