Permit: DP16-0151

Parcel: 12404097C


Addresses:

950 N TYNDALL AV


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP16-0151

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
09/24/2019 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
09/20/2019 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by VFLORES1 - COMPLETE ALL THE WORK AS DISCUSSED IN THE FIELD AT THIS TIME. SEE THE FOLLOWING INSPECTIONS FOR COMMENTS. THIS WILL INCLUDE ALL INTERIOR AND EXTERIOR WORK INCLUDING, BUT NOT LIMITED TO GRADING, LANDSCAPING, ADA ACCESS TO ALL AREAS, GENERAL SITE WORK, AND ANY OTHER ITEMS LIKE REQUIRES BICYCLE PARKING, AND SIGNAGE.
08/16/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - I walked the accessible parking on the lowest level with Dave. Slopes are within compliance but the accessible pathway is only 22 inches wide.
08/14/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - I walked the site with Dave Roberts and the GC. Accessible parking spaces are not in compliance based on the current striping Complete the work outside the building and provide safe access
08/12/2019 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DROBERT5 - THIS SITE IS NOT READY FOR THE ENGINEERING FINAL TO BE COMPLETE. WORK CONTINUES ON ALL SIDE OF THE BUILDING BETWEEN THE BUILDING AND THE STREET. COMPLETE ALL WORK OUTSIDE OF THE BUILDING AND REMOVE ALL EXCESS CONSTRUCTION MATERIAL, SCAFFOLDING, D.G., DIRT, TRASH AND DEBRIS PRIOR TO CALLING IN FOR THIS INSPECTION.
08/12/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Complete all work shown on plan and call for all required inspections on your permit card. There is ongoing work on all sides of the building. Their scaffolding installed. Their construction materials and debris on all sides of the building. Sidewalk scuppers need to rain drains. Trees need to be properly staked.
09/26/2019 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
09/20/2019 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by VFLORES1 - COMPLETE ALL WORK NOTED ABOVE PRIOR TO SCHEDULING ANOTHER FINAL GRADING INSPECTION. ONCE ALL WORK PROVIDE THE DEPARTMENT WITH THE REQUIRED CLOSEOUT DOCUMENTATION PRIOR TO SCHEDULING THE INSPECTION, THIS WILL INCLUDE APPROVED REVISED DRAWINGS, A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, TO BE USED DURING THE INSPECTION.