Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP16-0151
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/26/2019 | SITE - Stormwater Follow-up | DROBERTS | Approved | Entered by DROBERT5 - |
06/05/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - I WALKED THE SITE TO SEE WHAT TYPE OF WORK IS HAPPENING AND IF THERE ARE ANY VIOLATIONS OF THE SWPPP AT THIS TIME, NONE NOTED AT THIS TIME. I MET WITH FRED TURK THE SUPERINTENDENT FOR THE DEVELOPER AND DISCUSSED THE DAY TO DAY OPERATIONS AND WHAT THEY NEED TO DO IN THE FUTURE. I HAVE REMINDED THEM THAT THEY NEED TO BE SCHEDULING REGULAR INSPECTIONS FOR THIS PERMIT AT LEAST ONCE A MONTH TO COVER THE STORMWATER REQUIREMENTS. HE WILL BE DOING THIS IN THE FUTURE AND WILL ALSO SCHEDULE OTHER INSPECTIONS FOR THIS PERMIT AS NEEDED. MOST OF THE WORK ON THIS SITE IS WITHIN THE REALMS OF THE BUILDING COLUMNS AND FLOORS, NOTHING HAPPENING OUTSIDE OF THE FOOT PRINT FOR THE BUILDING. |