Permit Details

Status:
Complete
Type:
Development Package
Address:
2543 E GRANT RD
Address NEW:
2543 E GRANT RD
Apply Date:
10/29/2015
Applicant:
Lisa Bowers
Description:
THE YARDOriginally approved 4/20/2016 (15 pages)1st Revision approved 6/15/2016 (all pages r

Permit Reviews

Permit Number - DP15-0190
Permit Status: Complete
Permit Description: THE YARDOriginally approved 4/20/2016 (15 pages)1st Revision approved 6/15/2016 (all pages r
Start Date Submittal Complete Date Status  
01/27/2016 DEV PKG - RESUBMITTAL 04/18/2016 COMPLETED Review Details
04/18/2016 DEV PKG - RESUBMITTAL 05/23/2017 COMPLETED Review Details
06/02/2016 DEV PKG - REVISION 05/23/2017 COMPLETED Review Details
06/09/2017 DEV PKG - REVISION 06/22/2017 COMPLETED Review Details
10/29/2015 DEV PKG - OK TO SUBMIT 10/29/2015 COMPLETED Review Details
12/02/2015 DEV PKG 01/27/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0190
Permit Description: THE YARDOriginally approved 4/20/2016 (15 pages)1st Revision approved 6/15/2016 (all pages r
Total Completed Inspections - 9
Date Description Inspector Results Comments
12/20/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/20/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CORRECTION REQUIRED:

1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
3) PROVIDE STORM WATER SELF INSPECTIONS PER YOUR PLAN
4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT
5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE
6) PROVIDE AN APPROVED CIVIL PLAN FOR INSPECTIONS

SITE IN NON-COMPLIANCE WITH YOUR STORM WATER PERMIT.
CORRECT WITH IN 10 WORKING DAYS AND CALL FOR AN INSPECTION.
NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION}
06/14/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/14/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 06/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/14/2017 SITE - Stormwater Follow-up Passed {Activity date: 06/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/25/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NOT READY FOR FINAL APPROVAL.
1) ENSURE COMPLIANCE WITH YOUR SWPPP UNTIL CONSTRUCTION IS COMPLETED.
2) CALL FOR A FOLLOW UP INSPECTION DURING PAVING
3) CALL FOR INSPECTION FOR ANY SITE/GRADING CHANGES PRIOR TO FINAL} ; {Activity date: 05/19/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/25/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
06/14/2017 ENGR Grading Final Passed {Activity date: 06/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/02/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE PREPPED AND READY FOR PAVING, SUBGRADE APPEARS TO BE PER PLAN
2) NO SIGNIFICANT SITE CONCERNS AT THIS TIME} ; {Activity date: 05/25/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NOT READY FOR FINAL APPROVAL.
1) ENSURE COMPLIANCE WITH YOUR SWPPP UNTIL CONSTRUCTION IS COMPLETED.
2) CALL FOR A FOLLOW UP INSPECTION DURING PAVING
3) CALL FOR INSPECTION FOR ANY SITE/GRADING CHANGES PRIOR TO FINAL} ; {Activity date: 05/19/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - GRADING OF THE PARKING AREAS, AND COMPLETE THE INSTALLATION FOR THE REBAR FOR THE ALLEY ADJACENT TO THE TRASH ENCLOSURE.} ; {Activity date: 01/25/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO INSPECTIONS CALLED IN FOR SITE/NO UNDERGROUND SITE AT THIS TIME} ; {Activity date: 01/11/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND STORM PIPE} ; {Activity date: 01/06/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR ROUGH GRADING SITE AND POURING SOME VERTICLE CURB.
2) THE MAJORITY OF THE SITE IS SURFACE DRAINAGE, NO UNDERGROUND STORM PIPE SHOWN ON APPROVED PLANS.}
06/14/2017 SITE - Stormwater Final Inspection Passed {Activity date: 06/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FILE AN NOI WITH ADEQ} ; {Activity date: 12/20/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CORRECTION REQUIRED:

1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
3) PROVIDE STORM WATER SELF INSPECTIONS PER YOUR PLAN
4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT
5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE
6) PROVIDE AN APPROVED CIVIL PLAN FOR INSPECTIONS

SITE IN NON-COMPLIANCE WITH YOUR STORM WATER PERMIT.
CORRECT WITH IN 10 WORKING DAYS AND CALL FOR AN INSPECTION.
NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION}
06/14/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 06/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/11/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME, ENSURE COMPLIANCE WITH YOUR SWPPP AND ADEQ PERMIT} ; {Activity date: 01/06/2017; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) RE-ESTABLISH SILT SOCK ALONG GRANT ROAD.
2) REMOVE SEDIEMNT CONTROLS ON BACK SIDE OF WALL ALONG WEST SIDE PERIMETER.
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT PER YOUR SWPPP
4) INSTALL AND USE A CONCRETE WASH OUT ON SITE
5) POST YOUR NOI AT ENTRANCE TO SITE
6) CALL FOR ANY CHANGES TO YOUR GRADING/SITE/LANDSCAPE} ; {Activity date: 01/05/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONTACT} ; {Activity date: 12/20/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CORRECTION REQUIRED:

1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
3) PROVIDE STORM WATER SELF INSPECTIONS PER YOUR PLAN
4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT
5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE
6) PROVIDE AN APPROVED CIVIL PLAN FOR INSPECTIONS

SITE IN NON-COMPLIANCE WITH YOUR STORM WATER PERMIT.
CORRECT WITH IN 10 WORKING DAYS AND CALL FOR AN INSPECTION.
NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION}
06/14/2017 COT - ENGR - Signage Final Passed {Activity date: 06/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/30/2017 ENGR Engineering Final Passed {Activity date: 06/30/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/16/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PARTIAL APPROVAL FOR ENGINEERING
2) PRIOR TO GRADING FINAL APPROVAL COMPLETE ALL ITEMS LISTED ON THE PREVIOUS INSPECTION (6/14/17).} ; {Activity date: 06/14/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL ROCK RIP RAP AS SHOWN ON APPROVED PLANS
2) REPAIR WALL OPENING AT NW CORNER OF WEST PARKING LOT TO ALLOW FOR DRAINAGE.
3) INSTALL WHEEL STOPS AND PARKING LOT SIGNAGE TO INCLUDE HC PARKING SIGNS PER APPROVED PLANS
4) CALL IN FOR ENGINNERING FINAL INSPECTION UNDER YOUR BLDG PERMIT.
5) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD.
6) COMPLETE PLANTING PLAN.
7) REMOVE CONSTRUCTION EQUIP AND MATERIALS FOR PUBLIC ACCESS.
8) CORRECT THREE HC PARKING SPACES, THEY DO NOT MEET ADA SLOPE REQUIREMENTS} ; {Activity date: 05/25/2017; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NOT READY FOR FINAL APPROVAL.
1) ENSURE COMPLIANCE WITH YOUR SWPPP UNTIL CONSTRUCTION IS COMPLETED.
2) CALL FOR A FOLLOW UP INSPECTION DURING PAVING
3) CALL FOR INSPECTION FOR ANY SITE/GRADING CHANGES PRIOR TO FINAL}

Documents

File Name Document Type  
001_COVER SHEET_1 OF 15.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES_2 OF 15.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_3 OF 15.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING_4 OF 15.TIF DEVELOPMENT PACKAGE VIEW
005_UTILITIES / EASEMENTS_5 OF 15.TIF DEVELOPMENT PACKAGE VIEW
006_DETAILS_6 OF 15.TIF DEVELOPMENT PACKAGE VIEW
007_SWPPP_7 OF 15.TIF DEVELOPMENT PACKAGE VIEW
005_OFFSITE DRIVEWAY DETAILS_7A OF 15.TIF DEVELOPMENT PACKAGE VIEW
008_LANDSCAPE COVER SHEET_8 OF 15.TIF DEVELOPMENT PACKAGE VIEW
009_LANDSCAPE NOTES / SCHEDULES_9 OF 15.TIF DEVELOPMENT PACKAGE VIEW
010_LANDSCAPE_10 OF 15.TIF DEVELOPMENT PACKAGE VIEW
011_IRRIGATION_11 OF 15.TIF DEVELOPMENT PACKAGE VIEW
012_RAINWATER HARVESTING_12 OF 15.TIF DEVELOPMENT PACKAGE VIEW
013_SITE WATER BUDGET_13 OF 15.TIF DEVELOPMENT PACKAGE VIEW
014_LANDSCAPE / IRRIGATION DETAILS_14 OF 15.TIF DEVELOPMENT PACKAGE VIEW
015_LANDSCAPE / IRRIGATION DETAILS_15 OF 15.TIF DEVELOPMENT PACKAGE VIEW
ADDRESSING COMMENTS.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
P16WS00054 THE YARD AT GRANT APPROVAL LETTER.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
YARD TUCSON - EOR CERTIFICATION LETTER - 06-23-17.PDF DOCUMENTS VIEW