Address Search: 2543 E GRANT RD
Search
Parcel Attributes
| Parcel | 11207165D |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street+culvert |
| City of Tucson Zoning | R-2, C-2 |
| Tucson Ward | Ward 3 |
| Tucson Registered Neighborhood | Country Glenn |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 2543 E GRANT RD
Date - 08/19/2026 10:37 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 08/19/2026 10:37 p.m.
Total Number Of Rezone Cases - (1)
| Case No. | Description | New Zone | Status | Status Date |
|---|---|---|---|---|
| C9-19-05 | Forgeus Parking | P | Approved | 05/15/2019 |
Special Development Requests & Requirements
Address: 2543 E GRANT RD
Date - 08/19/2026 10:37 p.m.
Total Number Of Special Development Permits - (3)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000003622 | CLOSED | 04/04/2011 | N/A | Historical Information | ||
| T16SA00039 | COMPLETE | 02/09/2016 | N/A | Zoning Adminstration Letter | ||
| T17SA00137 | APPROVED | 04/03/2017 | N/A | Historic Landmark Sign | HISTORIC LANDMARK SIGN - POLE SIGN (GRANT RD LUMBER) RESTORATION TO PRE 1960 APPEARANCE (CLASSIC ERA) MAIL OUT 4/10/17 - TUCSON PIMA COUNTY HISTORIC COMMISSION PLANS REVIEW SUBCOMMITTEE MEETING 4/27/17 - APPROVED DIRECTOR DECISION ISSUED 5/9/17 - APPROVED |
Permits
Address: 2543 E GRANT RD
Date - 08/19/2026 10:37 p.m.
Total Number Of Permits - (31)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| DP15-0190 | Complete | 10/29/2015 | 12/27/2017 | Development Package | THE YARDOriginally approved 4/20/2016 (15 pages)1st Revision approved 6/15/2016 (all pages r | |
| DP19-0169 | Complete | 07/15/2019 | 11/16/2026 | Development Package | SITE/GRADING - The Yard at Grant, parking expansion. | |
| TZ-CMP-0724-00086 | Complete | 07/08/2024 | N/A | Zoning Verification Letter | I would like a zoning compliance letter. The city prepared a letter for these addresses in 2021 via Activity # T21SA00338, if that helps. | |
| TC-COM-0723-01635 | Complete | 07/05/2023 | 03/24/2024 | Commercial Building | Site Lighting (Associated with DP19-0169) | |
| TR-ROW-0623-00850 | Complete | 06/08/2023 | 08/22/2023 | Right-of-Way (ROW) | SITE/GRADING - The Yard at Grant, parking expansion. Sidewalk in ROW at Forgeus and paving tie in in ROW at south alley. | |
| DS16-04 | Approved | 01/28/2016 | N/A | Zoning Verification Letter | TSMR - TSMR multiple modifications to trash pickup. modificiaton to sidewalk and curb radii. See description in PRO/SIRE | |
| TZ-CMP-0123-00027 | Complete | 01/05/2023 | N/A | Zoning Verification Letter | This is a request for a Zoning Verification Letter for the following property located with the City limits. Please include the current zoning designation(s), whether the property is a historic landmark, and reference any applicable land use/zoning/planning related permits and approvals. | |
| T06ME00335 | CLOSED | 06/23/2006 | 08/10/2008 | MECH | GAS PACK (APA) | |
| T08OT00012 | FINAL | 01/03/2008 | 10/04/2008 | SIGN | 14259 | |
| T15OT00207 | FINAL | 02/13/2015 | 09/28/2015 | SIGN | BANNER 45 DAY; 02/13/15 TO 03/30/15 | |
| T16BU01256 | FINAL | 09/14/2016 | 12/24/2017 | DEMO | DEMO COMMERCIAL BLDG | |
| T16CM02729 | C OF O | 04/14/2016 | 01/22/2018 | COMBO | RESTAURANT | |
| T16FC00209 | FINAL | 11/04/2016 | 12/10/2017 | FIRECONS | New Sprinkler System - 176 Heads | |
| T16RW02025 | FINAL | 10/14/2016 | 11/09/2016 | ROW | 3 LF REAR OF THE ADDRESS IN ASPHALT ALLEY TO REPAIR HIT SERVICE | |
| T16RW02206 | FINAL | 10/22/2016 | 11/23/2016 | ROW | 2' DIAMETER ASPHALT PLUG TO ABANDON GAS LINE, PER M.A.G. DETAIL NO 212 | |
| T17FC00049 | FINAL | 01/18/2017 | 12/24/2017 | FIRECONS | Installation of New Fire Alarm System | |
| T17FC00106 | FINAL | 02/02/2017 | 08/02/2017 | FIRECONS | Underground piping... | |
| T17FC00235 | VOID | 03/23/2017 | N/A | FIRECONS | Installation of New Fire System | |
| T17FC00302 | FINAL | 04/18/2017 | 12/10/2017 | FIRECONS | Install one kitchen hood system | |
| T17FC00712 | FINAL | 08/29/2017 | 03/11/2018 | FIRECONS | Installation of a New Fire Alarm System | |
| T17FO00562 | FINAL | 06/27/2017 | 06/27/2018 | FIREOPER | PLACE OF ASSEMBLY-RESTAURANT | |
| T17FO00588 | FINAL | 07/10/2017 | 03/11/2018 | FIREOPER | BULK CO2 SYSTEM WITH DETECTION | |
| T17OT00510 | FINAL | 05/17/2017 | 04/02/2018 | SIGN | HLS SIGN CASE # T17SA00137 / HLS 17-04 SUBJECT TO THE CHARACTER DEFINING FEATURES / NO CHRACTER DEFINING TEXT DECLARED | |
| T17OT00673 | FINAL | 06/28/2017 | 03/14/2018 | SIGN | 1- ILLUM SF / 2- ILLUM WALL SIGN | |
| T17OT00858 | FINAL | 08/23/2017 | 03/14/2018 | SIGN | 1- ENCLOSED NEON SIGN | |
| T17RW00124 | FINAL | 01/05/2017 | 03/01/2017 | ROW | 6" Fire Service with installation of fire hydrant - 10 feet in the asphalt | |
| T17RW00265 | FINAL | 01/17/2017 | 05/13/2017 | ROW | (2) 5 X 5 IN BLKTOP ON SPRING ST- TO TIE IN NEW GAS LINE | |
| T17RW01473 | FINAL | 04/04/2017 | 05/19/2017 | ROW | Remove 150 LF curb and sidewalk, grading for 300 linear feet of sidewalk, 40 LF aprons and 200 linear feet of curb. Due to Grant Rd being under a pavement moratorium, the bike lane will required a 2" mill and inlay for the entire width of the lane and extend 25' longitudinally beyond the pavement cut on both sides. 4/20/17 WORK DESCRIPTION CHANGED TO: 8 - HORIZONTAL CURB CUTS, APPROXIMATELY 50 LF, 4 - NEW CURBING TO CLOSE EXISTING OPENINGS, APPROXIMATELY 20 LF, REMOVE 200 LF OF EXISTING SIDEWALK, GRADING FOR NEW SIDEWALK 340 LF | |
| T17RW02362 | FINAL | 06/01/2017 | 07/02/2017 | ROW | Remove 50lf curb and sidewalk,grading,Install 130 linear feet of sidewalk and 55 linear feet of curb install new driveway with curb returns. Place 5 type 2sidewalk scuppers per sd 205 and drive apron on Tucson blvd all per development plan DP15-0190 | |
| T20CM06135 | FINAL | 09/09/2020 | 04/25/2021 | COMBO | SPLIT MASTER METER ADD 2ND GAS METER | |
| T98EX00946 | CLOSED | 08/24/1998 | 10/23/1998 | EXCAV | EXCAV:TRENCH FOR ALARM SYSTEM |
Plans
Address: 2543 E GRANT RD
Date - 08/19/2026 10:37 p.m.
Total Number Of Plans - (1)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CWH-15-0190 | Active | 10/29/2015 | 12/27/2017 | -- Commercial Water Harvesting Ordinance | THE YARDOriginally approved 4/20/2016 (15 pages)1st Revision approved 6/15/2016 (all pages r |