Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/30/2017 |
ENGR Engineering Final
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 06/16/2017 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) PARTIAL APPROVAL FOR ENGINEERING
2) PRIOR TO GRADING FINAL APPROVAL COMPLETE ALL ITEMS LISTED ON THE PREVIOUS INSPECTION (6/14/17). |
| 06/14/2017 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) INSTALL ROCK RIP RAP AS SHOWN ON APPROVED PLANS
2) REPAIR WALL OPENING AT NW CORNER OF WEST PARKING LOT TO ALLOW FOR DRAINAGE.
3) INSTALL WHEEL STOPS AND PARKING LOT SIGNAGE TO INCLUDE HC PARKING SIGNS PER APPROVED PLANS
4) CALL IN FOR ENGINNERING FINAL INSPECTION UNDER YOUR BLDG PERMIT.
5) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD.
6) COMPLETE PLANTING PLAN.
7) REMOVE CONSTRUCTION EQUIP AND MATERIALS FOR PUBLIC ACCESS.
8) CORRECT THREE HC PARKING SPACES, THEY DO NOT MEET ADA SLOPE REQUIREMENTS |
| 05/25/2017 |
ENGR Engineering Final
|
MRUSSO |
Denied |
Entered by DROBERT5 - NOT READY FOR FINAL APPROVAL.
1) ENSURE COMPLIANCE WITH YOUR SWPPP UNTIL CONSTRUCTION IS COMPLETED.
2) CALL FOR A FOLLOW UP INSPECTION DURING PAVING
3) CALL FOR INSPECTION FOR ANY SITE/GRADING CHANGES PRIOR TO FINAL |
| 06/30/2017 |
ENGR Engineering Final
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 06/16/2017 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - 1) PARTIAL APPROVAL FOR ENGINEERING
2) PRIOR TO GRADING FINAL APPROVAL COMPLETE ALL ITEMS LISTED ON THE PREVIOUS INSPECTION (6/14/17). |