Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 06/14/2017 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 01/11/2017 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME, ENSURE COMPLIANCE WITH YOUR SWPPP AND ADEQ PERMIT |
| 01/06/2017 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Correction Required |
Entered by DROBERT5 - 1) RE-ESTABLISH SILT SOCK ALONG GRANT ROAD.
2) REMOVE SEDIEMNT CONTROLS ON BACK SIDE OF WALL ALONG WEST SIDE PERIMETER.
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT PER YOUR SWPPP
4) INSTALL AND USE A CONCRETE WASH OUT ON SITE
5) POST YOUR NOI AT ENTRANCE TO SITE
6) CALL FOR ANY CHANGES TO YOUR GRADING/SITE/LANDSCAPE |
| 01/05/2017 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CONTACT |
| 12/20/2016 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Correction Required |
Entered by DROBERT5 - CORRECTION REQUIRED:
1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
3) PROVIDE STORM WATER SELF INSPECTIONS PER YOUR PLAN
4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT
5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE
6) PROVIDE AN APPROVED CIVIL PLAN FOR INSPECTIONS
SITE IN NON-COMPLIANCE WITH YOUR STORM WATER PERMIT.
CORRECT WITH IN 10 WORKING DAYS AND CALL FOR AN INSPECTION.
NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION |