Inspection Status: Passed
Inspection History: SITE - Stormwater Final Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 06/14/2017 |
SITE - Stormwater Final Inspection |
MRUSSO |
Approved |
Entered by DROBERT5 - FILE AN NOI WITH ADEQ |
| 12/20/2016 |
SITE - Stormwater Final Inspection |
MRUSSO |
Correction Required |
Entered by DROBERT5 - CORRECTION REQUIRED:
1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
3) PROVIDE STORM WATER SELF INSPECTIONS PER YOUR PLAN
4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT
5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE
6) PROVIDE AN APPROVED CIVIL PLAN FOR INSPECTIONS
SITE IN NON-COMPLIANCE WITH YOUR STORM WATER PERMIT.
CORRECT WITH IN 10 WORKING DAYS AND CALL FOR AN INSPECTION.
NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION |