Permit Details

Status:
Complete
Type:
Development Package
Address:
1777 N POTTER PL
Address NEW:
1777 N POTTER PL
Apply Date:
10/08/2015
Applicant:
Description:
GRADING & SWPPP

Permit Reviews

Permit Number - DP15-0175
Permit Status: Complete
Permit Description: GRADING & SWPPP
Start Date Submittal Complete Date Status  
02/03/2016 RESUB - SITE and/or GRADING 07/14/2016 COMPLETED Review Details
07/14/2016 REVISION - GRADING 09/16/2016 COMPLETED Review Details
09/16/2016 REVISION - GRADING 10/18/2016 COMPLETED Review Details
10/08/2015 DEV PKG - OK TO SUBMIT (GRADING ONLY) 10/08/2015 COMPLETED Review Details
10/08/2015 GRADING 11/17/2015 COMPLETED Review Details
12/02/2015 GRADING 12/15/2015 COMPLETED Review Details
12/07/2017 REVISION - GRADING 12/07/2017 COMPLETED Review Details
12/30/2015 RESUB - SITE and/or GRADING 02/03/2016 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP15-0175
Permit Status: Complete
Permit Description: GRADING & SWPPP
Total Outstanding Activity Conditions - 1
Date Name
01/28/2016 The following 6 conditions apply to grading permit DP15-0175:1)Call for SWPPP inspection and Grading Pre-construction meeting. For a PDSD Engineering Inspections, call IVR (791-3111), or schedule with a Customer Service Representative at the Planning & Development Services Department, or contact PDSD Engineering at 837-4888. Call for inspections of SWPP control installation, drainage improvements, basin and sewer protection infrastructure, and other inspections as discussed with Inspector at time of Pre-con meeting.2)There shall be no disturbance outside of the approved grading limits. Any grading outside of the grading limits requires separate grading permit or a submittal, review, and approval for separate permits. Any outstanding offsite easements that are needed must be obtained by property owner/contractor prior to commencement of grading construction.3)All Interim SWPP controls shall be maintained during construction until all permanent control installations are completed. 4)If there are any revisions to design or construction, contact PDSD Engineering Inspector or PDSD Engineering Civil Engineer to discuss proposed change to determine whether one of the following may be needed: notation of change may be needed in computer system and later as-built, details of change, or revised plan submittal. 5)With as-built submittal, provide copy of Revision application with cover letter explaining revisions as as-built conditions. Provide also certification statements from Registrant (for overall project substantial completion as well as basin and drainage infrastructure installation) prior to approval of final grading. Include as-built elevations of inverts of inlet and outlets of surface drainage system, private street as-built information, and other elevations as deemed necessary by RLS. Certification statement from Geotechnical Engineer is also required to certify completion of pool/well closure.6)Permitee shall notify PDSD when grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all erosion control measures, have been completed in accordance with approved grading plan and grading permit, and all conditions of permit are completed.

Outstanding Inspections

Permit Status: Complete
Permit Number: DP15-0175
Permite Description: GRADING & SWPPP
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/23/2020 ENGR Engineering Final N/A Partial Pass {Activity date: 04/23/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MISSING CLOSEOUT DOCUMENTATION.} ; {Activity date: 04/23/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SEE PREVIOUS COMMENTS FROM INSPECTION DATED 3/23/2020} ; {Activity date: 03/23/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by SFLORES2 - PROVIDE ALL CLOSEOUT DOCUMENTATION SO THIS SITE CAN BE APPROVED AND CLOSED.} ; {Activity date: 05/15/2018; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE ALL SITE WORK TO INCLUDE DRIVEWAYS AND SIDEWALKS
2) COMPLET ALL LANDSCAPING AND STABILIZE COMMON AREAS SHOWN ON THE APPROVED PLAN AND DISTURBED AREAS FROM CONSTRUCTION.
3) PROVIDE A CERTIFICATION FROM THE ENG OF RECORD} ; {Activity date: 08/18/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PRIOR TO FINAL GRADING APPROVAL, COMPLETE ALL SITE WORK TO INCLUDE BUT NOT LIMITED TO SIDE WALKS, DRIVEWAYS, COMMON AREAS AND LANDSCAPING.
2) COMPLETE WHAT IS SHOWN ON THE APPROVED CIVIL PLAN - CALL FOR A FINAL GRADING INSPECTION.}

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0175
Permit Description: GRADING & SWPPP
Total Completed Inspections - 8
Date Description Inspector Results Comments
02/25/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/25/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) MAINTAIN INSTALLED SWPP CONTROLS AS REQUIRED
2) EXISTING GRAVEL ENTRANEC/ MAY NEED TO INSTALL A STABILIZED CONSTRUCTION ENTRANCE SHOWN ONYOUR SWPPP.
3) SWEEP UP TRACKING OFF ADJACENT ROADWAY
4) INSTALL AND USE A CONCRETE/MATERIALS WASH OUT PER YOUR SWPPP.
5) CONTACT COT ENG. SECTION / MIKE RUSSO 240-9859 FOR ANY SITE GRADING/LANDSCAPING/SWPPP CONCERNS AND/OR QUESTIONS.} ; {Activity date: 02/24/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - SPOKE WITH PROJECT MANAGER, RE-SCHEDULED MEETING.}
05/15/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/15/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
05/15/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 05/15/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/08/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - CONTRACTOR HAS NOT INSTALLED SEDIMENT CONTROLS.
CONTRACTOR CLEARING VEGETATION.}
05/15/2018 COT - ENGR - Signage Final Passed {Activity date: 05/15/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
07/25/2018 ENGR Grading Final Passed {Activity date: 07/25/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
03/21/2020 SITE - Stormwater Follow-up Passed {Activity date: 03/21/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/31/2018; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - protection in place} ; {Activity date: 05/15/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/02/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STROM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/10/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO CONTACT, NO RESPOSE TO PREVIOUS INSPECTIONS} ; {Activity date: 11/02/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO INSPECTIONS CALLED IN
SITE APPEARS TO BE IN COMPLIANCE WITH SWPPP} ; {Activity date: 05/05/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/22/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO APPARENT CONCERNS AT THIS TIME.}
03/23/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/23/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/31/2018; Status: Partial Approval; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - started landscape insp.}
04/23/2020 SITE - Stormwater Final Inspection Passed {Activity date: 04/23/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MISSING CLOSEOUT DOCUMENTATION.} ; {Activity date: 05/18/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - GENERAL CLEANUP OF THE SITE FOR ALL CONCRETE MATERIAL.} ; {Activity date: 08/18/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FILE A NOTICE OF TERMINATION WITH ADEQ}

Documents

File Name Document Type  
001_COVER SHEET / GENERAL NOTES_1 OF 8.TIF DEVELOPMENT PACKAGE VIEW
002_PRIVATE SEWER NOTES_2 OF 8.TIF DEVELOPMENT PACKAGE VIEW
003_PRIVATE SEWER / PROFILES_3 OF 8.TIF DEVELOPMENT PACKAGE VIEW
004_PRIVATE SEWER / PROFILES_4 OF 8.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING PLAN SHEET_5 OF 8.TIF DEVELOPMENT PACKAGE VIEW
006_GRADING / DETAILS SHEET_6 OF 8.TIF DEVELOPMENT PACKAGE VIEW
007_DETAILS_7 OF 8.TIF DEVELOPMENT PACKAGE VIEW
008_SWPPP SITE_8 OF 8.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
CASA SETON LANDSCAPE.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW