| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/02/2015 | PATRICIA GEHLEN | NPPO | REVIEW | Needs Review | |
| 12/02/2015 | PATRICIA GEHLEN | ZONING | REVIEW | Needs Review | |
| 12/02/2015 | PATRICIA GEHLEN | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
| 12/14/2015 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Reqs Change | DATE: December 14, 2015 TO: Bill Carroll, P.E., Engineering and Environmental Consultants, Inc. SUBJECT: Development Package Engineering Review submittal PROJECT: Casa Seton Grading Plan Development Package Engineering Review LOCATION: 1777 N POTTER P, 123-01-017F, T14S R14E Sec5, Ward 6 IMPACT FEE AREA: Central FEMA PANEL: 2277L, Zone X-Unshaded WATERSHED: Flowing Wells Wash Watershed (a non-designated basin management area) REVIEWER: Elizabeth Leibold P.E. ACTIVITY NUMBER: DP15-0175 SUMMARY: This Development Package includes the Grading Plan for the new proposed subdivision Casa Seton, which was received and reviewed by Planning & Development Services Department Engineering Division. Staff Review for project was delayed due to employee illness. Phone call occurred 14DEC15 with engineering consultant to go over comments for both Final Plat review and grading reviews. Development Services Department Engineering Division does not recommend approval of this Development Package until the following comments are addressed. BASE PLAN / MASTER COVER SHEETS/ GENERAL NOTES: 1) Tech Man Sec. 2-01: Address the following cover sheet comments: a) Revise general note 8 to include (H:V) and clarify greater as less steep or similar. b) Note 44 appears to be not applicable as the only areas are lots and basin common area. Remove or clarify if there are any landscape easements. c) Add note, or clarify note 40, regarding that these plans will require separate and permits for grading construction review and approval under DP15-0175, as well as for PCRWRD sewer permitting review and approval. d) Add general note that soils shall be properly prepared for compaction in area of pool removal, or other verbiage per geotechnical report. DRAINAGE REPORT COMMENTS: 2) Tech Man Sec.4-04.2.3.1.3.A.6: Clarify proposed walls or future walls. Provide sizing calculations for proposed subdivision perimeter wall openings. Assuring pre- and post developed conditions are thoroughly described in report. 3) Tech Man Sec.2-01.10.5: Explain in drainage report whether there is any offsite watershed area that is conveyed from upstream offsite parcels in pre-developed conditions that will require an interceptor swale of other design to convey flows through development site. GRADING, PAVING, DETAIL SHEET COMMENTS: 4) UDC Sec.8.6.5.A: Compliance with Tentative Plat shall be shown on grading plan. The submittal appears to not reflect latest version of the conceptual grading design as show on the Tentative Plat. Assure all details and planview notations and design are updated, including but not limited to: a) dimensions for water line clearance at south grading area near entrance, b) notes regarding removal of portions of old sewer line, c) updated lot grading details, d) minimum lot pad elevations to address differential grading requirements. 5) Tech Man Sec.4-03.3.5.1.3.a: Label basin-utility and basin structure setbacks per approved Tentative Plat. 6) Tech Man Sec.4-03.3.5.1.4: Show details for geotechnical recommendations for seepage control at retaining wall or at side slopes grades for basin. 7) Tech Man Secs.2-01.4.1.C, 8-01.5.2.G: Address the following grading comments: a) Limits of grading shall coincide with needed fill on project site to accommodate slope or fill and construction area; clarify that perimeter elevations are maintaining existing flow patterns, necessary construction area and fill runout on grading planview. b) Clarify with spot elevations on planviews the proposed lot drainage grading design, as well as basin design. c) Include basin dimensions, including width, for inspection purposes. d) Show any interceptor swale along upstream/south boundary to address any offsite flows from sub-watershed upstream of parcel. Show any swale with width dimensioned within a common area as needed. e) Provide additional data or other cross sections for grading design; delineate, dimension width, and label existing sewer and water line easements at south and north areas of project. Show on plans using lot detail and or cross sections how Geotechnical Evaluation Report recommendations are met on grading plan. Assure recommendations for slopes, basin setbacks from building and private street, are reflected on plans. Provide additional details for utility trench protection from adjacent basin for both sides of basin (where south meets western edge and along western edge, only south detail was provided), based on soils report and addenda. f) Tech Man Sec.4-04.2.3.1.5.C: Correct nomenclature for wall openings since only screen walls proposed (weep holes are used for retaining systems only to release pore water pressure). g) Depict and label local Basis of Elevation, on a grading sheet planview. h) On grading planview sheets, all existing and proposed easements (utility, sewer, drainage, TCE, maintenance, access, etc.) are to be dimensioned and labeled as to their purposes. i) Tech Man Sec.4-04.2.3.1.5: The proposed flows at the inlet structure of the basin are in line with the proposed sewer trench. This could be considered a conflict with proposed sewer and the proposed basin; the City is concerned about stormwater migration into the sewer line trench near and under the proposed basin. Provide additional details based on geotechnical recommendations. j) For the information regarding utility placement, the September 25th 2015 geotechnical addendum letter 6th paragraph on page 1 should be reflected on grading plan. STORMWATER POLLUTION PREVENTION PLAN COMMENTS: 8) Provide SWPP in next submittal. For resubmittal, provide revised development package including revised grading and SWPP plan sheets, revised drainage report, comprehensive response letter, and if needed, revised soils report or addendum and any other documents. If you have questions, call me at 837-4934. Elizabeth Leibold, P.E., CPM, CFM Civil Engineer Engineering Division Planning & Development Services Dept |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/15/2015 | AROMERO4 | OUT TO CUSTOMER | Completed |