Permit Review Detail
Review Status: Completed
Review Details: RESUB - SITE and/or GRADING
Permit Number - DP15-0175
Review Name: RESUB - SITE and/or GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/15/2016 | ANDREW CONNOR | NPPO | REVIEW | Reqs Change | The grading plan has been reviewed by the Landscape / NPPO Section but cannot approve the plan until all Engineering, comments, concerns, and appropriate revisions have been addressed. |
| 01/15/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 01/20/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Casa Seton Grading Plan (2nd Review) DP15-0175 TRANSMITTAL DATE: January 20, 2016 DUE DATE: January 29, 2016 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. The grading plan has been reviewed by the Zoning Section but cannot approve the plan until all Engineering, comments, concerns, and appropriate revisions have been addressed. Once approved by Engineering Zoning is willing to provide an over the counter review. Please call or email to schedule this review. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 01/28/2016 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approved | DATE: January 28, 2016 TO: Bill Carroll, P.E., Engineering and Environmental Consultants, Inc. SUBJECT: Development Package Engineering Review re-submittal PROJECT: Casa Seton Grading Plan Development Package Engineering Review LOCATION: 1777 N POTTER P, 123-01-017F, T14S R14E Sec5, Ward 6 IMPACT FEE AREA: Central FEMA PANEL: 2277L, Zone X-Unshaded WATERSHED: Flowing Wells Wash Watershed (a non-designated basin management area) REVIEWER: Elizabeth Leibold P.E. ACTIVITY NUMBER: DP15-0175 SUMMARY: This Development Package includes the revised Grading Plan for the new proposed subdivision Casa Seton, which was received and reviewed by Planning & Development Services Department Engineering Division. Development Services Department Engineering Division recommends approval of this Development Package. The following 6 conditions apply to grading permit DP15-0175: 1) Call for SWPPP inspection and Grading Pre-construction meeting. For a PDSD Engineering Inspections, call IVR (791-3111), or schedule with a Customer Service Representative at the Planning & Development Services Department, or contact PDSD Engineering at 837-4888. Call for inspections of SWPP control installation, drainage improvements, basin and sewer protection infrastructure, and other inspections as discussed with Inspector at time of Pre-con meeting. 2) There shall be no disturbance outside of the approved grading limits. Any grading outside of the grading limits requires separate grading permit or a submittal, review, and approval for separate permits. Any outstanding offsite easements that are needed must be obtained by property owner/contractor prior to commencement of grading construction. 3) All Interim SWPP controls shall be maintained during construction until all permanent control installations are completed. 4) If there are any revisions to design or construction, contact PDSD Engineering Inspector or PDSD Engineering Civil Engineer to discuss proposed change to determine whether one of the following may be needed: notation of change may be needed in computer system and later as-built, details of change, or revised plan submittal. 5) With as-built submittal, provide copy of Revision application with cover letter explaining revisions as as-built conditions. Provide also certification statements from Registrant (for overall project substantial completion as well as basin and drainage infrastructure installation) prior to approval of final grading. Include as-built elevations of inverts of inlet and outlets of surface drainage system, private street as-built information, and other elevations as deemed necessary by RLS. Certification statement from Geotechnical Engineer is also required to certify completion of pool/well closure. 6) Permitee shall notify PDSD when grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all erosion control measures, have been completed in accordance with approved grading plan and grading permit, and all conditions of permit are completed. If you have questions, call me at 837-4934. Elizabeth Leibold, P.E., CPM, CFM Civil Engineer Engineering Division Planning & Development Services Department elizabeth.leibold@tucsonaz.gov 837-4934 |