Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/25/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by MRUSSO1 - 1) MAINTAIN INSTALLED SWPP CONTROLS AS REQUIRED
2) EXISTING GRAVEL ENTRANEC/ MAY NEED TO INSTALL A STABILIZED CONSTRUCTION ENTRANCE SHOWN ONYOUR SWPPP.
3) SWEEP UP TRACKING OFF ADJACENT ROADWAY
4) INSTALL AND USE A CONCRETE/MATERIALS WASH OUT PER YOUR SWPPP.
5) CONTACT COT ENG. SECTION / MIKE RUSSO 240-9859 FOR ANY SITE GRADING/LANDSCAPING/SWPPP CONCERNS AND/OR QUESTIONS. |
| 02/24/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by MRUSSO1 - SPOKE WITH PROJECT MANAGER, RE-SCHEDULED MEETING. |