Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP15-0175

Parcel: 12301017F


Addresses:

1777 N POTTER PL

Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
04/23/2020 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 - MISSING CLOSEOUT DOCUMENTATION.
04/23/2020 ENGR Engineering Final DROBERTS Partial Approval Entered by DROBERT5 - SEE PREVIOUS COMMENTS FROM INSPECTION DATED 3/23/2020
03/23/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by SFLORES2 - PROVIDE ALL CLOSEOUT DOCUMENTATION SO THIS SITE CAN BE APPROVED AND CLOSED.
05/15/2018 ENGR Engineering Final MRUSSO Denied Entered by DROBERT5 - 1) COMPLETE ALL SITE WORK TO INCLUDE DRIVEWAYS AND SIDEWALKS 2) COMPLET ALL LANDSCAPING AND STABILIZE COMMON AREAS SHOWN ON THE APPROVED PLAN AND DISTURBED AREAS FROM CONSTRUCTION. 3) PROVIDE A CERTIFICATION FROM THE ENG OF RECORD
08/18/2017 ENGR Engineering Final MRUSSO Continued Entered by DROBERT5 - 1) PRIOR TO FINAL GRADING APPROVAL, COMPLETE ALL SITE WORK TO INCLUDE BUT NOT LIMITED TO SIDE WALKS, DRIVEWAYS, COMMON AREAS AND LANDSCAPING. 2) COMPLETE WHAT IS SHOWN ON THE APPROVED CIVIL PLAN - CALL FOR A FINAL GRADING INSPECTION.
07/25/2018 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
10/28/2015 ENGR Engineering Final MRUSSO Not ready for Inspection Entered by DROBERT5 - NO APPROVED PLANS, DEMO ONLY