Permit: DP14-0143
Permit Details
Apply Date:
08/21/2014
Applicant:
Lisa Bowers
Description:
DP - WILMOT PLAZA Originally approved 11/18/2014Revision 1 approved 4/30/2015 (all pages)Rev
Permit Reviews
Permit Number - DP14-0143
Permit Status: Complete
Permit Description: DP - WILMOT PLAZA Originally approved 11/18/2014Revision 1 approved 4/30/2015 (all pages)Rev
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/10/2017 | DEV PKG - REVISION | 01/12/2017 | COMPLETED |
03/24/2016 | DEV PKG - REVISION | 04/08/2016 | COMPLETED |
04/08/2015 | DEV PKG - REVISION | 04/21/2015 | COMPLETED |
04/23/2015 | DEV PKG - REVISION | 04/30/2015 | COMPLETED |
06/03/2015 | DEV PKG - REVISION | 06/25/2015 | COMPLETED |
06/25/2015 | DEV PKG - REVISION | 07/17/2015 | COMPLETED |
07/17/2015 | DEV PKG - REVISION | 07/30/2015 | COMPLETED |
08/21/2014 | DEV PKG - OK TO SUBMIT | 08/21/2014 | COMPLETED |
08/21/2014 | DEV PKG | 10/16/2014 | COMPLETED |
10/16/2014 | DEV PKG - RESUBMITTAL | 11/05/2014 | COMPLETED |
11/04/2015 | DEV PKG - REVISION | 11/23/2015 | COMPLETED |
11/05/2014 | DEV PKG - RESUBMITTAL | 12/09/2014 | COMPLETED |
11/23/2015 | DEV PKG - REVISION | 12/04/2015 | COMPLETED |
12/09/2014 | DEV PKG - RESUBMITTAL | 12/16/2014 | COMPLETED |
12/16/2014 | DEV PKG - RESUBMITTAL | 04/06/2015 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP14-0143
Permit Description: DP - WILMOT PLAZA Originally approved 11/18/2014Revision 1 approved 4/30/2015 (all pages)Rev
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/08/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/08/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC STILL NEEDS TO INSTALL SWPPP CONTROLS PROVIDE NOI . DROPED OFF PER-CON PACKET TO BE FILLED OUT.} | |
05/04/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 05/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/07/2016; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/19/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/29/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSPECTION PER HIGHLIGHTS ON 11x17 PLANS IN 2492.} ; {Activity date: 07/28/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON WEST SIDE OF DICKS.} | |
05/04/2017 | ENGR Engineering Final | Passed | {Activity date: 05/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 01/03/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH PATRICA GEHLEN ABOUT TRASH ENCLOUSER NOT ON GRADING PLANS FOR LAST BUILDING ON SOUTH WEST SIDE OF SITE SHE SIAD ES AP PLANS.} ; {Activity date: 07/07/2016; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL WORK AT SOUTH WEST SIDE OF SITE (ONLY) AND PROVIDE AS-BUILTS AND CERT LETTER FOR ALL OF SITE.} ; {Activity date: 06/01/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH GC OWER AND ENGINEER OF RECORD WENT OVER WORK THAT NEEDED TO BE DONE TO COMPLET WORK OTHER THEN SOTH WEST SIDE OF SITE.} ; {Activity date: 05/19/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
05/04/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 05/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/07/2016; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/27/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} | |
05/04/2017 | ENGR Grading Final | Passed | {Activity date: 05/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
05/04/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 05/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/07/2016; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
05/04/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/07/2016; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 01/21/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE APPROVED INSTALL OF SWPPP CONTROLS. INSTALL NOI SIGN AT GATE.} |