Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP14-0143
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/04/2017 | ENGR Engineering Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
01/03/2017 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - MET WITH PATRICA GEHLEN ABOUT TRASH ENCLOUSER NOT ON GRADING PLANS FOR LAST BUILDING ON SOUTH WEST SIDE OF SITE SHE SIAD ES AP PLANS. |
07/07/2016 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by RLEDONN1 - COMPLET ALL WORK AT SOUTH WEST SIDE OF SITE (ONLY) AND PROVIDE AS-BUILTS AND CERT LETTER FOR ALL OF SITE. |
06/01/2016 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - WALKED SITE WITH GC OWER AND ENGINEER OF RECORD WENT OVER WORK THAT NEEDED TO BE DONE TO COMPLET WORK OTHER THEN SOTH WEST SIDE OF SITE. |
05/19/2016 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - |