Permit Details

Status:
Complete
Type:
Development Package
Address:
4810 N 1ST AV
Address NEW:
4810 N 1ST AV
Apply Date:
09/17/2012
Applicant:
Description:
SITE/GRADING/SWPP - DEVELOPMENT PACKAGEOriginally approved 12/5/20121st Revision approved 1/30

Permit Reviews

Permit Number - DP12-0158
Permit Status: Complete
Permit Description: SITE/GRADING/SWPP - DEVELOPMENT PACKAGEOriginally approved 12/5/20121st Revision approved 1/30
Start Date Submittal Complete Date Status  
01/29/2013 REVISION - - 1ST 02/05/2013 COMPLETED Review Details
04/19/2013 REVISION - SITE 05/23/2013 COMPLETED Review Details
09/17/2012 DEV PKG - OK TO SUBMIT 09/17/2012 COMPLETED Review Details
09/17/2012 DEV PKG 10/19/2012 COMPLETED Review Details
10/19/2012 DEV PKG - RESUBMITTAL 11/20/2012 COMPLETED Review Details
11/20/2012 DEV PKG - RESUBMITTAL 01/16/2013 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0158
Permit Description: SITE/GRADING/SWPP - DEVELOPMENT PACKAGEOriginally approved 12/5/20121st Revision approved 1/30
Total Completed Inspections - 8
Date Description Inspector Results Comments
01/23/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/23/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER YOUR SWPPP
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
3) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN NEEDED
4) POST A COPY OF YOUR NOI
5) SWEEP UP TRACKING ROUTINELY
6) CALL FOR ANY QUESTION AND/OR CONCERNS}
04/12/2013 SITE - Stormwater Follow-up Passed {Activity date: 04/12/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/04/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE IS 100% STABILIZED.} ; {Activity date: 03/19/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND /OR CONCERNS AT THIS TIME} ; {Activity date: 03/18/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 03/08/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COULDN'T FIND YOUR CONCRETE/MATERIALS WASH OUT ON SITE
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
3) NO SIGNIFICANT CHANGES TO SITE WORK} ; {Activity date: 02/28/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) 200 + FEET OF HDPE STORM PIPE INSTALLED ALONG SOUTH SIDE OF SITE - OK TO COVER
2) PROVIDE CLARIFICATION FROM ENG OF RECORD ON OUTLET OF STORM PIPE (SW CORNER) AND DETAILS OF WATER HARVESTING AREAS ALONG 1ST AVE
3) NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/22/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BLDG
2) TRASH ENCLOSURE BEING CONSTRUCTED
3) PERIMETER RETAINING WALL ALONG SOUTH SIDE INSTALLED
4) CONTRACTOR STATED THAT STORM DRAIN PIPE INSTALL NEXT WEEK
5) NO SIGNIFICANT STORM WATER CONCERNS. SWEEP SOIL UP OFF 1ST AVE} ; {Activity date: 02/06/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 01/29/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED FOOTINGS AND RE-BAR LAYOUT FOR TRASH ENCLOSURE. CONCRETE APRON MUST HAVE #4 RE-BAR, 12" ON CENTER BOTH WAYS.
2) ENSURE TRACKED SOIL IS SWEPT OFF PUBLIC ROADWAYS
3) ENSURE A CONCRETE WASH OUT IS INSTALLED}
04/12/2013 COT - ENGR - Site - Assurance Release Passed {Activity date: 04/12/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 12/27/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FUTURE HOME OF CULVERS RESTAURANT. SITE HAS BEEN DEMO'D, OLD GAS STATION AND STORE HAS BEEN REMOVED.
NO CONSTRUCTION ACTIVITY AS OF YET.}
04/12/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 04/12/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
04/15/2013 SITE - Stormwater Final Inspection Passed {Activity date: 04/15/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/12/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SUBMIT YOR "NOT" (NOTICE OF TERMANATION) TO THE STATE OF AZ}
05/13/2013 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/13/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SCREEN WALL HAS BEEN COMPLETED, WAITING FOR PAINT} ; {Activity date: 05/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AWAITING COMPLETION OF SCREEN WALL ALONG SOUTH SIDE OF SITE} ; {Activity date: 04/30/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR INSTALLING A 5 FOOT SCREEN WALL ALONG THE SOUTH SIDE OF THE SITE SHOWN ON THE APPROVED PLAN} ; {Activity date: 04/15/2013; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE ALL LANDSCAPING PER PLAN AND NPPO AGREEMENT} ; {Activity date: 04/03/2013; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR REMOVED TREES ON THAT WERE SHOWN ON THE NPPO PLAN TO BE PRESERVED IN PLACE.
CONTRACTOR MUST TALK WITH THE CITY'S LANDSCAPE ARCHITECT TO DEVELOPE A REMEDIATION STRATEGY.}
05/17/2013 ENGR Engineering Final Passed {Activity date: 05/17/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/13/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES, CALL IN FOR FINAL GRADING} ; {Activity date: 05/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SCREEN WALL HAS BEEN COMPLETED, WAITING FOR PAINT} ; {Activity date: 05/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AWAITING COMPLETION OF SCREEN WALL ALONG SOUTH SIDE OF SITE} ; {Activity date: 04/30/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE AS-BUILT
2) PROVIDE ENG CERT STATEMENT
3) COMPLETE LANDSCAPE
4) CALL FOR RE-INSPECTION} ; {Activity date: 04/15/2013; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - GRADING FINAL APPROVAL NOT TO BE GIVEN UNTIL:
1) CERT STATEMENT FROM THE ENG OF RECORD
2) AS-BUILT DRAWING.
3) RAILING INSTALLED ALONG SIDEWALK
4) WHEEL STOPS INSTALLED ALONG CURB CUT AT RET/DET BASIN
5) STRIPING COMPLETED PER PLAN
6) HC SIGNS INSTALLED
7) LANDSCAPE COMPLETED
8) EQUIPMENT, AND CONSTRUCTION MATERIAL REMOVED FROM SITE} ; {Activity date: 04/12/2013; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE ALL SITE WORK AS SHOWN ON YOUR APPROVED GRADING PLAN
2) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECOED
3) PROVIDE AN AS-BUILT FOR THE CITY OF TUCSON
4) COMPLETE LANDSCAPING PER PLAN
5) PROVIDE VERIFICATION THAT THE CHANGES ,ADE TO THE NPPO WERE ACCEPTABLE}
09/19/2016 ENGR Grading Final Passed {Activity date: 09/19/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET_I OF 12.TIF GRADING PLANS VIEW
002_SITE_2 OF 12.TIF GRADING PLANS VIEW
003_GRADING/DRAINAGE_3 OF 12.TIF GRADING PLANS VIEW
004_SITE CIVIL DETAILS_4 OF 12.TIF GRADING PLANS VIEW
005_UTILITY_5 OF 12.TIF GRADING PLANS VIEW
006_UTILITY_5 OF 12.TIF GRADING PLANS VIEW
007_SWPPP-EXISTING CONDITIONS MAP_6 OF 12.TIF GRADING PLANS VIEW
008_SWPPP-BMP CONTROLS INSTALLATION MAP_7 OF12.TIF GRADING PLANS VIEW
009_NPPO_8 OF 12.TIF GRADING PLANS VIEW
010_LANDSCAPE_9 OF 12.TIF GRADING PLANS VIEW
011_IRRIGATION_10 OF 12.TIF GRADING PLANS VIEW
012_WATER HARVESTING_11 OF 12.TIF GRADING PLANS VIEW
013_CONSTRUCTION DETAILS_12 OF 12.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW
None DOCUMENTS VIEW