Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 04/12/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 04/04/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME |
| 04/03/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - SEDIMENT CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE IS 100% STABILIZED. |
| 03/19/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND /OR CONCERNS AT THIS TIME |
| 03/18/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO STORM WATER COCNERNS AT THIS TIME |
| 03/08/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) COULDN'T FIND YOUR CONCRETE/MATERIALS WASH OUT ON SITE
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
3) NO SIGNIFICANT CHANGES TO SITE WORK |
| 02/28/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) 200 + FEET OF HDPE STORM PIPE INSTALLED ALONG SOUTH SIDE OF SITE - OK TO COVER
2) PROVIDE CLARIFICATION FROM ENG OF RECORD ON OUTLET OF STORM PIPE (SW CORNER) AND DETAILS OF WATER HARVESTING AREAS ALONG 1ST AVE
3) NO STORM WATER CONCERNS AT THIS TIME |
| 02/22/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BLDG
2) TRASH ENCLOSURE BEING CONSTRUCTED
3) PERIMETER RETAINING WALL ALONG SOUTH SIDE INSTALLED
4) CONTRACTOR STATED THAT STORM DRAIN PIPE INSTALL NEXT WEEK
5) NO SIGNIFICANT STORM WATER CONCERNS. SWEEP SOIL UP OFF 1ST AVE |
| 02/06/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 01/29/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) INSPECTED FOOTINGS AND RE-BAR LAYOUT FOR TRASH ENCLOSURE. CONCRETE APRON MUST HAVE #4 RE-BAR, 12" ON CENTER BOTH WAYS.
2) ENSURE TRACKED SOIL IS SWEPT OFF PUBLIC ROADWAYS
3) ENSURE A CONCRETE WASH OUT IS INSTALLED |