Permit: DP12-0158

Parcel: 108160070


Addresses:

4810 N 1ST AV

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
01/30/2013 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 - FOR TRASH ENCLOSURE ONLY.
04/15/2013 ENGR Grading Final MRUSSO Approved Entered by DROBERT5 -
04/03/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - SITE HAS NOT BEEN PAVED, SUBGRADE SET. CONTRACTOR WORKING THE RET/DET BASIN ALONG THE EAST SIDE
03/18/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - INSPECTED LIGHT POLE BASES AS COMPARED TO APPROVED PLAN - OK TO POUR CONCRETE
03/08/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) COULDN'T FIND YOUR CONCRETE/MATERIALS WASH OUT ON SITE 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 3) NO SIGNIFICANT CHANGES TO SITE WORK
02/28/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) 200 + FEET OF HDPE STORM PIPE INSTALLED ALONG SOUTH SIDE OF SITE - OK TO COVER 2) PROVIDE CLARIFICATION FROM ENG OF RECORD ON OUTLET OF STORM PIPE (SW CORNER) AND DETAILS OF WATER HARVESTING AREAS ALONG 1ST AVE 3) NO STORM WATER CONCERNS AT THIS TIME
02/22/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BLDG 2) TRASH ENCLOSURE BEING CONSTRUCTED 3) PERIMETER RETAINING WALL ALONG SOUTH SIDE INSTALLED 4) CONTRACTOR STATED THAT STORM DRAIN PIPE INSTALL NEXT WEEK 5) NO SIGNIFICANT STORM WATER CONCERNS. SWEEP SOIL UP OFF 1ST AVE
02/06/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME
01/29/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) INSPECTED FOOTINGS AND RE-BAR LAYOUT FOR TRASH ENCLOSURE. CONCRETE APRON MUST HAVE #4 RE-BAR, 12" ON CENTER BOTH WAYS. 2) ENSURE TRACKED SOIL IS SWEPT OFF PUBLIC ROADWAYS 3) ENSURE A CONCRETE WASH OUT IS INSTALLED
09/19/2016 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
09/19/2016 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -