Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/30/2013 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - FOR TRASH ENCLOSURE ONLY. |
| 04/15/2013 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 04/03/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - SITE HAS NOT BEEN PAVED, SUBGRADE SET.
CONTRACTOR WORKING THE RET/DET BASIN ALONG THE EAST SIDE
|
| 03/18/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - INSPECTED LIGHT POLE BASES AS COMPARED TO APPROVED PLAN - OK TO POUR CONCRETE |
| 03/08/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) COULDN'T FIND YOUR CONCRETE/MATERIALS WASH OUT ON SITE
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
3) NO SIGNIFICANT CHANGES TO SITE WORK |
| 02/28/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) 200 + FEET OF HDPE STORM PIPE INSTALLED ALONG SOUTH SIDE OF SITE - OK TO COVER
2) PROVIDE CLARIFICATION FROM ENG OF RECORD ON OUTLET OF STORM PIPE (SW CORNER) AND DETAILS OF WATER HARVESTING AREAS ALONG 1ST AVE
3) NO STORM WATER CONCERNS AT THIS TIME |
| 02/22/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BLDG
2) TRASH ENCLOSURE BEING CONSTRUCTED
3) PERIMETER RETAINING WALL ALONG SOUTH SIDE INSTALLED
4) CONTRACTOR STATED THAT STORM DRAIN PIPE INSTALL NEXT WEEK
5) NO SIGNIFICANT STORM WATER CONCERNS. SWEEP SOIL UP OFF 1ST AVE |
| 02/06/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 01/29/2013 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) INSPECTED FOOTINGS AND RE-BAR LAYOUT FOR TRASH ENCLOSURE. CONCRETE APRON MUST HAVE #4 RE-BAR, 12" ON CENTER BOTH WAYS.
2) ENSURE TRACKED SOIL IS SWEPT OFF PUBLIC ROADWAYS
3) ENSURE A CONCRETE WASH OUT IS INSTALLED |
| 09/19/2016 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 09/19/2016 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |