Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 205640620
Parcel Search
Parcel Attributes
| Parcel | 205640620 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | MH-1 |
| Tucson Ward | Ward 4 |
| Flood Related Information | FEMA Floodplain Area |
| Tucson Registered Neighborhood | Rita Ranch |
| Major Street & Route | Scenic Route, Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 12/06/2025 1:46 p.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 12/06/2025 1:46 p.m.
Total Number Of Rezone Cases - (6)
| Case No. | Description | New Zone | Status | Status Date | Address |
|---|---|---|---|---|---|
| C9-01-17 | Old Vail LLC - Old Vail Road | R-1 | Rejected | 02/05/2008 | 9311 S ATTERBURY WASH |
| C9-06-16 | Weinberg - Mary Ann Cleveland | R-2 | Closed | 06/05/2006 | 9311 S ATTERBURY WASH |
| C9-13-06 | Mtn Vail Ests 2- OVRd | R-1 | Effectuated | 06/26/2013 | 9311 S ATTERBURY WASH |
| C9-01-17 | Old Vail LLC - Old Vail Road | R-1 | Rejected | 02/05/2008 | 11311 E MARY ANN CLEVELAND |
| C9-06-16 | Weinberg - Mary Ann Cleveland | R-2 | Closed | 06/05/2006 | 11311 E MARY ANN CLEVELAND |
| C9-13-06 | Mtn Vail Ests 2- OVRd | R-1 | Effectuated | 06/26/2013 | 11311 E MARY ANN CLEVELAND |
Permits
Parcel Number - 205640620
Date - 12/06/2025 1:46 p.m.
Total Number Of Permits - (29)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| DP16-0002 | Complete | 01/06/2016 | 01/04/2027 | Development Package | GRADING ONLY | |
| DP16-0003 | Complete | 01/06/2016 | 08/18/2021 | Development Package | GRADING ONLY | |
| TR-ROW-0325-00386 | Complete | 03/24/2025 | 06/06/2025 | Right-of-Way (ROW) | Access into sewer easement from main road - clearing | |
| DP17-0252 | Issued | 10/23/2017 | 03/26/2022 | Development Package | Mountain Vail, Part G Phase 1 | |
| DP12-0198 | Complete | 10/30/2012 | 10/22/2017 | Development Package | GRADING - STOCK PILE | |
| DP15-0191 | Complete | 10/30/2015 | 01/25/2021 | Development Package | TENTATIVE PLAT/FLD - MOUNTAIN VAIL ESTATES PART G, LOTS 1-95 | |
| T10BU01922 | Final | 12/29/2010 | 06/21/2017 | GRADSWPP | GRADING & SWPP PART A-2 | |
| T10BU01923 | Withdrwn | 12/29/2010 | N/A | GRADSWPP | GRADING STOCKPILE; PART A-2 | |
| T10BU01924 | Expired | 12/29/2010 | 05/04/2013 | GRADSWPP | GRADING STOCKPILE; PART E | |
| T10BU01926 | Void | 12/29/2010 | N/A | GRADSWPP | GRADING & SWPP PART A-2 | |
| T10CM02085 | Expired | 07/28/2010 | 06/14/2014 | COMBO | LIFT STATION | |
| T10OT00621 | Expired | 03/19/2010 | N/A | FLOODPLN | FUP: T09BU00279 | |
| T10OT00623 | Final | 03/19/2010 | N/A | FLOODPLN | FUP: T09BU00280 & T09BU00281 | |
| T10OT00626 | Expired | 03/19/2010 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
| T10PL01451 | Expired | 09/17/2010 | 07/01/2014 | PLUMB | PRIVATE SEWER A1 LOTS 58 - 135 | |
| T11PL00243 | Expired | 02/08/2011 | 06/26/2016 | PLUMB | PRIVATE SEWER A2 LOTS 1 - 57 | |
| T12CM06933 | Void | 10/30/2012 | N/A | COMBO | PLACEMENT OF AN 8611 CU STOCKPILE ON A PART OF PART D, LOTS 227-242 &310-315, MOUNTAIN VAIL ESTATES BK 64, PG 59 | |
| T14BU00298 | Expired | 03/17/2014 | 11/05/2014 | WALL/FEN | SIGN AND RETAINING WALLS | |
| T14OT00204 | Expired | 02/13/2014 | 09/14/2014 | SIGN | SIGN PERMIT | |
| T14OT00373 | Expired | 03/31/2014 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
| T15EX00018 | Closed | 01/06/2015 | 03/07/2015 | EXCAV | REMOVAL OF EXISTING SIDEWALK AND CONSTRUCTION OF 2 HANDICAP TAMPS ON THE NORTH AND SOUTH SIDE OF ATTERBURY WASH WAY AT APPROX STA 16+00 AND TIE INTO EXISITING SIDEWALK FOR SCHOOL ACCERSS MODIFIED RAMPS PER STANTEC SEE ATTACHED | |
| T15OT01478 | Final | 10/30/2015 | N/A | FLOODPLN | FPUP - DP15-0191 | |
| T15TC00050 | Final | 01/06/2015 | N/A | BARRICAD | REMOVAL OF EXISTING SIDEWALK AND CONSTRUCTION OF 2 HANDICAP TAMPS ON THE NORTH AND SOUTH SIDE OF ATTERBURY WASH WAY AT APPROX STA 16+00 AND TIE INTO EXISITING SIDEWALK FOR SCHOOL ACCERSS MODIFIED RAMPS PER STANTEC SEE ATTACHED | |
| T16CM00975 | Final | 02/10/2016 | 04/30/2018 | COMBO | PRIVATE SEWER FOR SUBDIVISION | |
| T17BU00036 | Final | 01/25/2017 | 08/22/2017 | WALL/FEN | Max 3'4" RETAINING WALL w/ 5' high screen wall | |
| T17RW04848 | Final | 10/31/2017 | 12/02/2017 | ROW | Air- Vacuum Excavation of 3 Utility Potholes 12"x12" in size along north shoulder of Mary Ann Cleveland Way for Design Phase of Pima County Master Water Plan for the Esmond Station Regional Park. | |
| T18RW02438 | Final | 05/30/2018 | 07/31/2018 | ROW | BUILDING NEW INTERSECTION AT MARY ANN CLEVELAND WAY AND ATTERBURY WASH WAY. IMPROVEMENTS INCLUDE ADDITION OF CURB ACCESS RAMPS, CROSSWALKS, AND A TRAFFIC SIGNAL SYSTEM WITH INTEGRAL LIGHTING AND APPROACH LIGHTING. CAPITAL PROJECT MARY ANN CLEVELAND WAY AND ATTERBURY WASH WAY SA24 | |
| T19RW06841 | Final | 11/06/2019 | 04/01/2020 | ROW | TIE-IN NEW 3800 LF WATER MAIN FOR FUTURE LIBRARY BUILDING. INSTALL ADDITIONAL BOOSTER PUMP AT OLD VAIL BOOSTER STATION. WIDEN ROAD AND PROVIDE A LEFT TURN LANE INTO NEW LIBRARY. FLAGMAN SETUP TO BE USED FOR THE 12" CROSSING AT STA 241+55 (CL OF FUTURE ACCESS TO LIBRARY) CLOSE E/B MON. 1/13 AND CLOSE WB TUE 1/14 CIP/JOC OFFSITE IMPROVEMENTS FOR FUTURE SOUTHEAST LIBRARY-JOC:MA 17*0208 DP # REV1,PN-2-055-2018 **ROADWAY MUST BE CLEAR BY NOV. 23 FOR EL TOUR DE TUCSON BIKE RACE. R3 - PLAN CHANGE Water tie-in needed behind Southwest sidewalk at E Mary Ann Cleveland and Atterbury Wash Way intersection STA 269+00. Extra barricades needed to take Right Turn lane, and continue South on Atterbury for approx. | |
| T21RW05417 | Final | 12/30/2021 | 12/30/2021 | ROW | *EMERGENCY/AFTER-THE-FACT* Replace sewer manhole ring and cover. Jackhammer to remove concrete and pour new concrete to secure new manhole cover. Manhole ID: 3035-01 within signalized intersection of E Mary Ann Cleveland Wy and S Atterbury Wash Wy. |
Plans
Parcel Number - 205640620
Date - 12/06/2025 1:46 p.m.
Total Number Of Plans - 14
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CWH-16-0002 | Active | 01/06/2016 | 12/15/2020 | Basin | GRADING ONLY | |
| CWH-16-0003 | Active | 01/06/2016 | 08/18/2021 | Basin | GRADING ONLY | |
| S07-110 | Approved | 07/12/2007 | 04/23/2020 | Land Division | MOUNTAIN VAIL ESTATES | |
| S08-135 | Approved | 12/01/2008 | 02/22/2020 | Land Division | MOUNTAIN VAIL ESTATES,PHASE II | |
| T09PI00006 | Approved | 04/06/2009 | 10/06/2009 | Private Improvement Agreement | MT. VAIL ESTATES PART G LOTS 339-345 & 385-501 | |
| T09PI00007 | Approved | 04/06/2009 | 10/06/2009 | Private Improvement Agreement | Mountain Vail Estates, Part F, Lots 323-338 & Lots 346-384 | |
| T09PI00011 | Approved | 04/06/2009 | 10/06/2009 | Private Improvement Agreement | Mountain Vail Estates, Part B, Lots 136 thru 183 | |
| T17PI00019 | Approved | 03/17/2017 | 02/07/2021 | Private Improvement Agreement | MOUNTAIN VAIL ESTATES, PART "B", LOTS 1-21 | |
| S15-051 | Final | 10/30/2015 | 04/09/2022 | SUBDIVISION | FINAL/FLD- MOUNTAIN VAIL ESTATES | |
| S17-006 | Final | 02/08/2017 | 07/14/2022 | SUBDIVISION | FINAL PLAT - MOUNTAIN VAIL ESTATES - PART B, LOTS 1-21, C.A. "A" | |
| T15PRE0069 | Plan ck | 09/01/2015 | N/A | NEIGHBORHOOD NOTIFICATION | ||
| T16PI00003 | Closed | 02/11/2016 | 01/15/2017 | PAVING & SEWER | MOUNTAIN VAIL ESTATES PART G - PH I Offsite Improvement plans for the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on City of Tucson approved plan I-2016-003 (all in accordance with Pima County/City of Tucson Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction. | |
| T16PI00004 | Final | 02/12/2016 | 02/28/2021 | PAVING & SEWER | MOUNTAIN VAIL ESTATES PART G - PHASE II LOTS 15-48, 83-89, PART OF PARCEL A & COMMON AREAS "A-2", "B-2" & "C-2" Offsite Improvement plans for the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on City of Tucson approved plan I-2016-004 (all in accordance with Pima County/City of Tucson Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction. | |
| T16PRE0080 | Plan ck | 10/06/2016 | N/A | NEIGHBORHOOD NOTIFICATION |