Plan Details

Status:
Final
Type:
SUBDPLAT
Apply Date:
10/30/2015
Applicant:
THOMPSON, WARREN D
Description:
SUBC

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 5
Date Description Inspector Results Comments
10/19/2017 ASSURANCE - UTILITY SERVICES pyg Approved Revised letter from Tucson Water: Missing lot 77. TW verified that lot 77 has water service
07/06/2018 ASSURANCE - PC WASTEWATER SQUINLAN Approved The Final Acceptance and Discharge Authorization have been approved for G-2016-007 MOUNTAIN VAIL ESTATES PART G - PHASE II, LOTS 15-48 and 83-89, SEWER CONSTRUCTION PERMIT #P17WP00162, PDEQ #05316 .

Thank you,

Sylvia Quinlan
Engineer Plans Technician
Pima County- RWRD
Planning & Engineering Division
201 N Stone Ave, 3rd Floor
Tucson, AZ 85701
Office (520)724-6649
10/05/2018 ASSURANCE - DOT PERMITS & CODE ECRUZ Approved SEE TDOT ACCEPTANCE LETTER IN DOCUMENTS TABLE ON PRO (SIRE).
10/05/2018 ASSURANCE - DOT TRAFFIC ECRUZ Approved SEE TDOT ACCEPTANCE LETTER IN DOCUMENTS TABLE ON PRO (SIRE).
12/03/2019 ASSURANCE - DSD JV Approved ok to release lots 16,34 and 41

Plan Reviews

Plan Number - S15-051
Plan Status: Final
Plan Description: SUBC
Start Date Submittal Complete Date Status  
01/28/2016 RESUBMITTAL - FINAL PLAT - CONDO CONVERSION 02/02/2016 COMPLETED Review Details
02/04/2016 FINAL PLAT - PACKAGE 02/09/2016 COMPLETED Review Details
10/30/2015 FINAL PLAT - REVIEW 11/02/2015 COMPLETED Review Details
10/30/2015 FINAL PLAT - REVIEW 12/23/2015 COMPLETED Review Details
12/23/2015 RESUBMITTAL - FINAL PLAT - CONDO CONVERSION 01/28/2016 COMPLETED Review Details