Plan Details

Status:
Approved
Type:
Land Division
Apply Date:
07/12/2007
Applicant:
Unknown
Description:
MOUNTAIN VAIL ESTATES
Architects:
  • City of Tucson DTM Streets and Traffic Maintenance
  • DIAMOND VENTURES INC
  • FIDELITY NATIONAL TITLE AGENCY
  • MWEINBERG
Contractors:

Outstanding Plan Activity Conditions

Plan Number - S07-110
Plan Description: MOUNTAIN VAIL ESTATES
Date Name Approved Comments
07/12/2007 RECEIVED LETTER OF CERTIFICATION Not Approved

Outstanding Inspections

Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/02/2013 SPECIAL INSPECTION - Pima County Sewer (Third Party) Partial Pass {Activity date: 12/02/2013; Status: Partial Approval; Inspector: RMORGAN; Comment: Entered by KMEDINA1 - LOTS 58-135 APPROVED}
12/15/2016 COT - ENGR - Site - Assurance Release Partial Pass {Activity date: 12/15/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WALKED THE SITE AND FOUND THE FOLLOWING ITEMS TO BE INCOMPLETE AT THIS TIME: 1) THE LANDSCAPE INSTALLATIONS ON THIS SITE HAVE NOT BEEN PLACED ACCORDING TO THE APPROVED PLAN. THESE NEED TO BE CHANGED AND PLANTED AS THEY ARE ON THE APPROVED PLANS, OR REVISED APPROVED DRAWINGS NEED TO BE PROVIDED SHOWING THE SITE IN ITS CURRENT CONDITION.
2) THE SITE DRAINAGE STRUCTURES NEED TO BE CLEANED AND CLEARED PRIOR TO CALLING IN FOR THE FINAL FOR THIS SITE. 3) REMOVE ALL SILT AND SEDIMENT FROM WITHIN THE BASINS AND REPAIR ANY EROSION NOTED THROUGHOUT THE SITE. COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS AND PROVIDE APPROVED REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE SINCE IT WAS APPROVED FOR CONSTRUCTION.} ; {Activity date: 04/04/2014; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR INITIAL RELEASE AT THIS TIME.}
01/27/2017 COT - WATR - Design Plan Construction Partial Pass {Activity date: 01/27/2017; Status: Partial Approval; Inspector: PB; Comment: Entered by PBAUGHM1 - Water Approval for lots 1-57.}

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/24/2018 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Passed {Activity date: 04/24/2018; Status: Approved; Inspector: Rleigh1; Comment: Entered by RLEIGH1 - Letter of acceptance sent on Jun 24, 2014}

Plan Reviews

Plan Number - S07-110
Plan Status: Approved
Plan Description: MOUNTAIN VAIL ESTATES
Start Date Submittal Complete Date Status  
01/19/2011 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 02/04/2011 COMPLETED Review Details
01/25/2008 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 03/19/2008 COMPLETED Review Details
01/27/2009 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 02/26/2009 COMPLETED Review Details
01/27/2009 ASSURANCES 02/17/2009 COMPLETED Review Details
01/29/2009 REVISN TENT PLAT & CORE RESUB 01/30/2009 COMPLETED Review Details
03/24/2009 FINAL PLAT PACKAGE 03/30/2009 COMPLETED Review Details
04/08/2009 FINAL PLAT PACKAGE 04/10/2009 COMPLETED Review Details
04/24/2008 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 06/02/2008 COMPLETED Review Details
07/08/2008 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 08/16/2008 COMPLETED Review Details
07/13/2007 TENTATIVE PLAT REVIEW 09/11/2007 COMPLETED Review Details
09/22/2008 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 10/20/2008 COMPLETED Review Details
10/12/2007 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 11/26/2007 COMPLETED Review Details
11/09/2010 REVISION - TENT PLAT & CORE RESUB 12/01/2010 COMPLETED Review Details
12/02/2008 FINAL PLAT REVIEW 01/14/2009 COMPLETED Review Details