Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
11/06/2019
Applicant:
THE ASHTON COMPANY INC CONTRACTORS AND ENGINEERS
Description:
TIE-IN NEW 3800 LF WATER MAIN FOR FUTURE LIBRARY BUILDING. INSTALL ADDITIONAL BOOSTER PUMP AT OLD VAIL BOOSTER STATION. WIDEN ROAD AND PROVIDE A LEFT TURN LANE INTO NEW LIBRARY. FLAGMAN SETUP TO BE USED FOR THE 12" CROSSING AT STA 241+55 (CL OF FUTURE ACCESS TO LIBRARY) CLOSE E/B MON. 1/13 AND CLOSE WB TUE 1/14 CIP/JOC OFFSITE IMPROVEMENTS FOR FUTURE SOUTHEAST LIBRARY-JOC:MA 17*0208 DP # REV1,PN-2-055-2018 **ROADWAY MUST BE CLEAR BY NOV. 23 FOR EL TOUR DE TUCSON BIKE RACE. R3 - PLAN CHANGE Water tie-in needed behind Southwest sidewalk at E Mary Ann Cleveland and Atterbury Wash Way intersection STA 269+00. Extra barricades needed to take Right Turn lane, and continue South on Atterbury for approx.

Completed Inspections

Permit Status: Final
Permit Number: T19RW06841
Permit Description: TIE-IN NEW 3800 LF WATER MAIN FOR FUTURE LIBRARY BUILDING. INSTALL ADDITIONAL BOOSTER PUMP AT OLD VAIL BOOSTER STATION. WIDEN ROAD AND PROVIDE A LEFT TURN LANE INTO NEW LIBRARY. FLAGMAN SETUP TO BE USED FOR THE 12" CROSSING AT STA 241+55 (CL OF FUTURE ACCESS TO LIBRARY) CLOSE E/B MON. 1/13 AND CLOSE WB TUE 1/14 CIP/JOC OFFSITE IMPROVEMENTS FOR FUTURE SOUTHEAST LIBRARY-JOC:MA 17*0208 DP # REV1,PN-2-055-2018 **ROADWAY MUST BE CLEAR BY NOV. 23 FOR EL TOUR DE TUCSON BIKE RACE. R3 - PLAN CHANGE Water tie-in needed behind Southwest sidewalk at E Mary Ann Cleveland and Atterbury Wash Way intersection STA 269+00. Extra barricades needed to take Right Turn lane, and continue South on Atterbury for approx.
Total Completed Inspections - 1
Date Description Inspector Results Comments
12/09/2019 TDOT-EXCAV GENERAL INSPECTION BMONG Approved TC GOOD
RAIN