Parcel Search: 13819029B
Parcel Search
Parcel Attributes
| Parcel | 13819029B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-1 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Major Street & Route | Gateway Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 11/09/2026 7:49 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 13819029B
Date - 11/09/2026 7:49 a.m.
Total Number Of Permits - (63)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-0123-00203 | Complete | 01/03/2023 | 03/02/2023 | Right-of-Way (ROW) | Abandonment of groundwater monitoring well by grouting and removing the well vault, removing the concrete apron around the well vault, and patching the surface. Only excavation is of the existing traffic vault, concrete around it, and up to approximately 1-foot of soil to achieve surface restoration. | |
| TR-UTL-0723-01990 | Complete | 07/10/2023 | 09/29/2023 | Right-of-Way (ROW) - Utility | COX-PRJ254293-2-Cox to overlash total 668ft of 288ct fiber optic cable. | |
| TR-UTL-0723-02093 | Complete | 07/20/2023 | 10/09/2023 | Right-of-Way (ROW) - Utility | COX-PRJ254293-1-Cox to bore total 341' & trench 13', place 2" conduit, place vault, for system tie in. | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| T06AN00448 | Issued | 04/20/2006 | N/A | ADDRNEW | ||
| T06CM02271 | C of o | 04/20/2006 | 07/14/2008 | COMBO | NEW: RETAIL BLDG | |
| T07BU01029 | Final | 05/08/2007 | 10/13/2008 | GRADING | GRADING: DOLLAR GENERAL STORE | |
| T07EX00713 | Closed | 07/11/2007 | 09/09/2007 | EXCAV | EXCA:1-24' DRIVEWAY W/2-25'CURB RETURNS & 2-ACCESS RAMPS | |
| T07OT02300 | Final | 10/09/2007 | 07/13/2008 | SIGN | 13842 | |
| T15EX03143 | Final | 10/28/2015 | 01/02/2016 | EXCAV | We will be hole clearing, drilling, and installing one groundwater monitoring well to approximately 130 feet below ground surface. We will be returning to the well quarterly for groundwater monitoring which will last less than 30 minutes each quarter. | |
| T15TC02465 | Final | 10/28/2015 | N/A | BARRICAD | We will be hole clearing, drilling, and installing one groundwater monitoring well to approximately 130 feet below ground surface. We will be returning to the well quarterly for groundwater monitoring which will last less than 30 minutes each quarter. | |
| T17RW02139 | Expired | 05/19/2017 | 06/22/2017 | ROW | We will be surveying an offsite groundwater monitoring well.The two eastbound inside lanes on Valencia will be blocked temporary for approximately 30 minutes. | |
| T17RW02307 | Expired | 05/30/2017 | 07/05/2017 | ROW | We will be taking an offsite groundwater well sample once a quarter for 30 minutes each. The eastbound inside turn lane on Valencia Rd will be blocked temporarily. This permit reflects the second quarter 2017 monitoring event. | |
| T17RW04362 | Final | 10/04/2017 | 10/29/2017 | ROW | EMERGENCY 25 LF INTERSECTION S MISSIONDALE RD AND W VALENCIA RD 350 LF SOUTH OF VALENCIA RD ON S MISSIONDALE IN ASPHALT REPAIR LEAKING MAIN | |
| T17RW05051 | Final | 11/14/2017 | 12/15/2017 | ROW | ON MISSIONDALE, APPROX. 400' SOUTH OF VALENCIA RD IN ASPHALT FOR PERM PATCH | |
| T17RW05147 | Final | 11/20/2017 | 01/05/2018 | ROW | WE WILL BE TAKING AN OFFSITE GROUNDWATER MONITORING WELL SAMPLE ONCE A QUARTER FOR 30 MINUTES EACH EVENT FOR A TOTAL OF 2 HRS OF BARRICADING A YEAR; THE EASTBOUND INSIDE TURN LANE ON VALENCIA WILL BE BLOCKED TEMPORARY. THIS PERMIT REFLECTS THE FOURTH QUARTER 2017 MONITORING EVENT. | |
| T18RW01054 | Final | 03/05/2018 | 04/11/2018 | ROW | WE WILL BE TAKING AN OFFSITE GROUNDWATER MONITORING WELL SAMPLE ONCE A QUARTER FOR 30 MINUTES EACH EVENT FOR A TOTAL OF 2 HRS OF BARRICADING A YEAR; THE EASTBOUND INSIDE TURN LANE ON VALENCIA WILL BE BLOCKED TEMPORARY. THIS PERMIT REFLECTS THE FIRST QUARTER 2018 MONITORING EVENT. | |
| T18RW02226 | Final | 05/14/2018 | 05/24/2018 | ROW | WE WILL BE TAKING AN OFFSITE GROUNDWATER MONITORING WELL SAMPLE ONCE A QUARTER FOR 30 MINUTES EACH EVENT FOR A TOTAL OF 2 HRS OF BARRICADING A YEAR; THE EASTBOUND INSIDE TURN LANE ON VALENCIA WILL BE BLOCKED TEMPORARY. THIS PERMIT REFLECTS THE SECOND QUARTER 2018 MONITORING EVENT. | |
| T19RW02644 | Final | 05/10/2019 | 06/20/2019 | ROW | WE WILL BE TAKING AN OFFSITE GROUNDWATER MONITORING WELL SAMPLE ONCE A QUARTER FOR 30 MINUTES EACH EVENT FOR A TOTAL OF 2 HRS OF BARRICADING A YEAR; THE EASTBOUND INSIDE TURN LANE ON VALENCIA WILL BE BLOCKED TEMPORARY. THIS PERMIT REFLECTS THE SECOND QUARTER 2017 MONITORING EVENT. ADDRESS ON APPLICATION-115 W VALENCIA RD | |
| T19RW05063 | Void | 09/10/2019 | N/A | ROW | THE EASTBOUND INSIDE TURN LANE ON VALENCIA RD WILL BE BLOCKED TEMPORARY FOR OFFSITE GROUNDWATER MONITORING WELL SAMPLE FOR APPROXIMATELY 2 HRS. PERMIT VALID FOR DATES OF SEPTEMBER 17 - 18, 2019. BARRICADE SET-UP SHALL NOT START PRIOR TO 9:00 A.M. AND SHALL BE REMOVED PRIOR TO 3:30 P.M. | |
| T19RW06922 | Final | 11/12/2019 | 11/19/2019 | ROW | THE EASTBOUND INSIDE TURN LANE ON VALENCIA RD WILL BE BLOCKED TEMPORARY FOR OFFSITE GROUNDWATER MONITORING WELL SAMPLE FOR APPROXIMATELY 2 HRS. PERMIT VALID FOR DATE OF NOVEMBER 19, 2019 ONLY. BARRICADE SET-UP SHALL NOT START PRIOR TO 9:00 A.M. AND SHALL BE REMOVED PRIOR TO 3:30 P.M. | |
| T20RW00957 | Final | 02/14/2020 | 04/24/2020 | ROW | Starting in front of residence at TEP pole, riser down pole and trench/bore North 50' then West 15' to out of row WORK LOCATION IS ON MISSIONDALE RD | |
| T20RW01821 | Final | 03/23/2020 | 04/24/2020 | ROW | WE WILL BE TAKING AN OFFSITE GROUNDWATER MONITORYING WELL SAMPLE ONCE A QUARTER FOR 30 MINUTES EACH EVENT FOR A TOTAL OF 2HRS OF BARRICADING A YEAR. THE EASTBOUND INSIDE TURN LANE ON VALENCIA WILL BE BLOCKED TEMPORARY. THIS PERMIT REFLECTS THE FIRST QUARTER 2020 MONITORING EVENT. | |
| T20RW04627 | Final | 08/13/2020 | 10/14/2020 | ROW | Groundwater monitoring well sampling on the north side of eastbound Valencia Road, west of Missiondale Road. The lane closure and well sampling activities will take approximately 2 hours. | |
| T21RW01038 | Final | 03/05/2021 | 04/15/2021 | ROW | GROUNDWATER MONITORING WELL SAMPLING ON THE NORTH SIDE OF EASTBOUND VALENCIA ROAD, WEST OF MISSIONDALE ROAD. THE LANE CLOSURE AND WELL SAMPLING ACTIVITIES WILL TAKE APPROX. 2 HOURS. NOTE: Valencia Road is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. | |
| T21RW02689 | Final | 06/03/2021 | 07/15/2021 | ROW | LANE CLOSURE DUE TO AN OFFSITE GROUNDWATER MONITORING WELL SAMPLE ON THE NORTH SIDE OF EASTBOUND VALENCIA RD, WEST OF MISSIONDALE ROAD. LANE CLOSURE AND WELL SAMPLING ACTIVITIES WILL TAKE APPROXIMATELY 2HRS. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Code Enforcement
Parcel Number - 13819029B
Date - 11/09/2026 7:49 a.m.
Total Number Of Code Cases - 2
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T08FR04059 | Complete | 10/30/2008 | N/A | FIREINSP | DOLLAR GENERAL FIRE INSPECTION | |
| T10FR01057 | Complete | 05/27/2010 | N/A | FIREINSP | Dollar general fire inspection |
Plans
Parcel Number - 13819029B
Date - 11/09/2026 7:49 a.m.
Total Number Of Plans - 2
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T08BA00045 | Approved | 05/28/2008 | N/A | Basin | ||
| T08BA00046 | Approved | 05/28/2008 | N/A | Basin |