Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel12404097C
JurisdictionTucson
City of Tucson ZoningUC-1, UC-1
Tucson WardWard 6
Tucson Registered NeighborhoodWest University
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 11/24/2024 10:21 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
1/4 Mile Each Direction (N, E, S, W) 202 08/17/1905 None

Rezoning Cases

Date - 11/24/2024 10:21 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-12-01 C9-12-01 Main Gate Dist. (UOD) UOD Effectuated 01/05/2012 N TYNDALL

Special Development Requests & Requirements

Date - 11/24/2024 10:21 a.m.
Total Number Of Special Development Permits - (4)
Activity Number Status Apply Date Expired Date Type Description
T16SA00348 Approved 11/17/2017 The Project will be located on the current Chase Bank parking lot at the southeast corner of First St. and Tyndall Ave.The Property is zoned C-1 and in the Main Gate Overlay District (“MGOD) and is requesting the MGO zoning option, as it encourages the heights and density appropriate for student housing near the University.The Project’s 10-story design complies with the MGOD’s allowed height. Approved with conditions: 1. The red accent feature that wraps around the entire building (the "Red Strip") as a key design element, shall be constructed of one material. The applicant or its successor will repaint the red accent strip every seven (7) years, or as otherwise reasonably required to remedy significant color fading of the accent strip. 2. The applicant will enter into an agreement with the Islamic Center (ICT) of Tucson to memorialize any terms agreed to by the parties. The Agreement should address concerns raised by the ICT, including the 3. establishment of primary points of contacts during both construction and after the Project opens, alcohol service at the Property, rooftop pool location and hours, and events that may conflict with the ICT's Friday prayers. 4. The applicant shall present/provide an updated graphic of the rooftop design which retains the transition buffers between the rooftop amenity area and the building edges, especially on the Project's north edge facing the ICT. 5. The applicant shall submit a project Communications Plan ("Plan"). The Plan shall describes how the applicant or its successor property owner or its managing team will provide Project's neighbors (such as: ICT, West University Neighborhood Association, and the Marshall Foundation) the primary contact persons for the Project, both during construction and management.
T17SA00233 Complete N/A
T18SA00402 Final N/A TEMPORARY NOISE EXEMPTION
T19SA00397 Complete N/A ZONING LETTER

Permits

Parcel Number - 12404097C
Date - 11/24/2024 10:21 a.m.
Total Number Of Permits - (30)
Permit Permit Status Entered Date Expired Date Unit Type Description
T19FC00209 Expired 03/22/2019 04/10/2020 Fire Construction Permit Fire Alarm & Detection Systems - Install an Emergency Radio Communications Enhancement System in this 10-story Student Housing Building; Fire Alarm Systems - New Sq Ft: 20000; Fire Alarm Systems - # New Stories: 1; Additional Inspections: 10
T19OT00520 Issued 06/11/2019 12/08/2019 Sign - Permanent 2-ILLUM UC SIGN
TR-UTL-0724-01253 Withdrawn 07/01/2024 N/A Right-of-Way (ROW) - Utility A.3029338-1: Access of ex MH 6229 for splicing
TR-UTL-0724-01254 Complete 07/01/2024 11/06/2024 Right-of-Way (ROW) - Utility A.3029338-2: Access of ex MH 7031 & 7607 for splicing
DP16-0151 Complete 08/23/2016 03/24/2020 Development Package SITE/GRADING/SWPPP - STERLING - TYNDALL AVENUE (MGD)Originally approved: 12/27/2016 (25 pages)
TC-COM-1024-02058 Inspections 10/25/2024 04/27/2025 Commercial Building REPLACE A DEFECTIVE BUSS BARR PIECE IN A MULTIMETER PACK WITH A LIKE FOR LIKE OEM PART. METER PACK IS FOR 3 UNITS WITH PARTIAL POWER. 1003-1007-1009
T16CM09380 L of c 12/15/2016 03/23/2020 COMBO FOUNDATION FOR FUTURE STUDENT HOUSING TOWER
T17CM00004 C of o 01/03/2017 03/28/2020 COMBO STUDENT HOUSING TOWER
T17RW01074 Final 03/07/2017 03/11/2017 ROW POTHOLING 2 LOCATIONS ON 1ST ST, 3 LOCATIONS ON TYNDALL.
T17RW04903 Final 11/02/2017 12/03/2017 ROW Closure of Tyndall Ave between 1st and 2nd for installation of tower crane. Closure to start at noon, Friday, 11/3 and be open by 5pm, Sunday, 11/5
T18BU00321 Final 05/23/2018 02/08/2020 POOL/SPA SEMI PUBLIC POOL
T18FC00045 Final 01/16/2018 07/08/2020 FIRECONS INSTALL NEW FIRE SPRINKLER SYSTEM THROUGHOUT THE BUILDING AND GARAGE.
T18FC00196 Final 03/07/2018 03/16/2019 FIRECONS UNDERGROUND FIRE LINE FOR FUTURE BUILDING
T18FC00625 Final 07/31/2018 12/14/2020 FIRECONS NEW FIRE ALARM SYSTEM
T18RW00126 Final 01/04/2018 04/30/2019 ROW BARRICADING FOR CONCRETE TRUCKS 2/15/18 Modifying hours to include overnight work (6p - 6a) on either 2/15 or 2/16 for concrete pour per approved TNE. 2/28/18 Added 2 concrete pours on 3/22 and 3/26 3/20/18 Added a concrete pour on 3/30 per approved TNE 12/27/2018- FULL CLOSURE FOR CRANE REMOVAL 12/29-12/30/18; 24 HOUR 04/11/2019 FULL CLOSURE ON TYNDALL AV
T18RW01532 Final 04/05/2018 06/13/2018 ROW New Water service and meter and Fire Hydrant
T18RW01907 Final 04/27/2018 09/11/2018 ROW (Install 8"-10" sanitary sewer)1st Street to 5th Street along Euclid St. approximately 12' deep includes: 1,444 of 10" new sewer main Installing 4 new manholes boring 130 across University Blvd on Euclid St and all other associated work Tyndall Ave. 1st St to 2nd St along Tyndall Ave. includes: installing 2 manholes and all other associated work approximately 8' deep. ALL WORK PER APPROVED RWRD PLAN G-2016-073 MORATORIUM ON PAVEMENT CUTS; ADDITION PAVERS REQUIRED SEE APPROVED PLAN,
T19CM01193 Final 02/19/2019 03/18/2020 COMBO MECH,ELECTRIC WORK FOR FUTURE TENANT
T19CM01364 C of o 02/25/2019 07/06/2020 COMBO BANK
T19CM07043 Final 09/26/2019 07/08/2020 #609 COMBO TI: BATHROOMS FOR ADA
T19CM07116 Final 09/30/2019 09/01/2020 COMBO MECH COMPLAINCE PERMIT RELATED TO T17CM00004
T19FC00379 Final 05/17/2019 06/24/2020 FIRECONS Fire Alarm TI on 1st Floor - 27 Devices
T19FC00400 Final 05/28/2019 03/15/2020 FIRECONS Install new Fire Sprinkler Heads to new grid ceiling
T19OT00175 Final 02/22/2019 11/16/2019 SIGN 4- ILLUM WALL SIGNS
T19OT01140 Final 12/06/2019 09/02/2020 SIGN 2-ILLUM WALL SIGN
T19RW01796 Final 04/03/2019 06/03/2019 ROW Starting on the East side of N Tyndall and South of E 1st Street trench/bore going North 206' and place Cox Vault.
T19RW03710 Final 06/28/2019 07/29/2019 ROW Full closure for replacement of pavement along Tyndall, including new asphalt paving, vertical concrete curbs, concrete sidewalks, sidewalk scuppers, curb cuts, tree grates and vegetation, all per DP16-0151
T19RW06491 Final 10/24/2019 12/25/2019 ROW JOB WILL REQUIRE ACCESS TO MH#7607 TO SPLICE FIBER
T22OT00431 Final 06/14/2022 01/23/2023 SIGN sign on canopy face on west elevation - over ROW - has TRE
T22RW03168 Final 08/31/2022 10/01/2022 ROW Emergency window removal. Need to remove before it falls, will be placing lift in front of building. They will have spotters on the ground to direct pedestrian traffic. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Code Enforcement

Parcel Number - 12404097C
Date - 11/24/2024 10:21 a.m.
Total Number Of Code Cases - 5
Case Number Case Status Entered Date Closed Date Unit Type Description
T19DV07214 Complian 09/12/2019 09/26/2019 DNR_VIOL STORM WATER VIOLATIONS
T20DV03968 Noverify 06/08/2020 N/A DNR_VIOL WORK WITHOUT PERMITS ON THE PROPERTY
T20DV07302 Complian 11/07/2020 N/A DNR_VIOL STORM WATER DISCHARGE VIOLATIONS
T21DV03969 Complian 06/23/2021 06/24/2021 DNR_VIOL CONTAMINATED WATER DISCHARGING FROM THE PROPERTY
T21DV06019 Noverify 09/01/2021 N/A DNR_VIOL Rodent infestation