Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel12213065C
JurisdictionTucson, Pima County
Water Course

Street+culvert

City of Tucson ZoningC-1
Tucson WardWard 6
Tucson Registered NeighborhoodGarden District
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 08/18/2026 12:11 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-55-77 Pima To 22nd. Street, City Limits Out to Craycroft Road 1634 01/04/1956 2856

Permits

Parcel Number - 12213065C
Date - 08/18/2026 12:11 p.m.
Total Number Of Permits - (1)
Permit Permit Status Entered Date Expired Date Unit Type Description
TZ-CMP-1025-00170 Complete 10/03/2025 N/A Zoning Verification Letter Tucson Electric Power Company (TEP) is requesting a Zoning Administrator Determination for clarification of the Zoning Examiner’s authority to place conditions on Special Exception Land Uses (SELU) that may be less than or in excess of what is required by the Use Specific Standards that govern the use. More specifically, TEP requests a determination that the Zoning Examiner is empowered by the City of Tucson’s Unified Development Code (UDC) to condition the issuance of a Special Exception Land Use Permit for a TEP substation by granting relief of setback requirements and wall height standards when strict adherence does not further the overall intent and purpose of the UDC.

Plans

Parcel Number - 12213065C
Date - 08/18/2026 12:11 p.m.
Total Number Of Plans - 3
Plan Number Plan Status Application Date Expired Date Unit Type Description
TP-ENT-1224-00026 Withdrawn 12/05/2024 N/A Map/Use Changes - Entitlements Zoning Examiner Special Exception Land Use Permit for upgrade and expansion of existing 46kV substation. The substation expansion will be completed in three phases to allow circuits to remain in use during construction. Phase 1: TEP will construct a new wall around the adjacent vacant parcel and demolish the existing east wall of the existing substation. Phase 2: Construction of new 46kV transformer, switchgear, and associated substation facilities on the previously vacant parcel. Phase 3: remove old/existing transformer substation facilities, upgrade the grounding grid, and install a second new 46kV transformer, switchgear, and associated substation facilities.
TP-PRE-0124-00021 In review 01/24/2024 N/A Pre-Application Zoning Examiner Special Exception Land Use Permit for upgrade and expansion of existing 46kV substation. The substation expansion will be completed in three phases to allow circuits to remain in use during construction. Phase 1: TEP will construct a new wall around the adjacent vacant parcel and demolish the existing east wall of the existing substation. Phase 2: Construction of new 46kV transformer, switchgear, and associated substation facilities on the previously vacant parcel. Phase 3: remove old/existing transformer substation facilities, upgrade the grounding grid, and install a second new 46kV transformer, switchgear, and associated substation facilities.
TP-PRE-1024-00227 In review 10/01/2024 N/A Pre-Application Per recommendation from CDRC pre application meeting for North Alvernon Substation Expansion SELUP (TP-PRE-0124-00021), TEP is requesting a Design Review Board courtesy review of landscape plan and proposed wall treatment.