Address Search: 1230 N ALVERNON WY
Search
Parcel Attributes
| Parcel | 12213065C |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street+culvert |
| City of Tucson Zoning | C-1 |
| Tucson Ward | Ward 6 |
| Tucson Registered Neighborhood | Garden District |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 1230 N ALVERNON WY
Date - 08/19/2026 8:42 a.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 1230 N ALVERNON WY
Date - 08/19/2026 8:42 a.m.
Total Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TZ-CMP-1025-00170 | Complete | 10/03/2025 | N/A | Zoning Verification Letter | Tucson Electric Power Company (TEP) is requesting a Zoning Administrator Determination for clarification of the Zoning Examiner’s authority to place conditions on Special Exception Land Uses (SELU) that may be less than or in excess of what is required by the Use Specific Standards that govern the use. More specifically, TEP requests a determination that the Zoning Examiner is empowered by the City of Tucson’s Unified Development Code (UDC) to condition the issuance of a Special Exception Land Use Permit for a TEP substation by granting relief of setback requirements and wall height standards when strict adherence does not further the overall intent and purpose of the UDC. |
Plans
Address: 1230 N ALVERNON WY
Date - 08/19/2026 8:42 a.m.
Total Number Of Plans - (3)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TP-ENT-1224-00026 | Withdrawn | 12/05/2024 | N/A | -- Zoning Examiner Special Exception | Zoning Examiner Special Exception Land Use Permit for upgrade and expansion of existing 46kV substation. The substation expansion will be completed in three phases to allow circuits to remain in use during construction. Phase 1: TEP will construct a new wall around the adjacent vacant parcel and demolish the existing east wall of the existing substation. Phase 2: Construction of new 46kV transformer, switchgear, and associated substation facilities on the previously vacant parcel. Phase 3: remove old/existing transformer substation facilities, upgrade the grounding grid, and install a second new 46kV transformer, switchgear, and associated substation facilities. | |
| TP-PRE-0124-00021 | In Review | 01/24/2024 | N/A | -- Pre-Application Conference | Zoning Examiner Special Exception Land Use Permit for upgrade and expansion of existing 46kV substation. The substation expansion will be completed in three phases to allow circuits to remain in use during construction. Phase 1: TEP will construct a new wall around the adjacent vacant parcel and demolish the existing east wall of the existing substation. Phase 2: Construction of new 46kV transformer, switchgear, and associated substation facilities on the previously vacant parcel. Phase 3: remove old/existing transformer substation facilities, upgrade the grounding grid, and install a second new 46kV transformer, switchgear, and associated substation facilities. | |
| TP-PRE-1024-00227 | In Review | 10/01/2024 | N/A | -- Pre-Application Conference | Per recommendation from CDRC pre application meeting for North Alvernon Substation Expansion SELUP (TP-PRE-0124-00021), TEP is requesting a Design Review Board courtesy review of landscape plan and proposed wall treatment. |