Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 117110730
Parcel Search
Parcel Attributes
Parcel | 117110730 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | OCR-2 |
Tucson Ward | Ward 6 |
Tucson Downtown Incentive Zone | Downtown Core, Downtown Infill Incentive District |
Rio Nuevo Downtown | Rio Nuevo - Downtown |
Rio Nuevo Multipurpose Facilities District | Yes |
Tucson Registered Neighborhood | Downtown |
Redevelopment | Downtown Redevelopment District |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Addresses |
Annexations & Original City Zoning (OCZ)
Date - 02/07/2025 10:50 a.m.
Total Number Of OZC Plans - (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
Original Town Of Tucson | ORIGINAL | 08/07/1877 | None |
Special Development Requests & Requirements
Date - 02/07/2025 10:50 a.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
H000000180 | Closed | N/A |
Permits
Parcel Number - 117110730
Date - 02/07/2025 10:50 a.m.
Total Number Of Permits - (30)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-COM-0224-00336 | Issued | 02/20/2024 | 06/10/2025 | Commercial Building | TI Renovation of exiting interior space to prepare for a restaurant establishment. | |
TR-UTL-0323-00996 | Complete | 03/01/2023 | 05/12/2023 | Right-of-Way (ROW) - Utility | 24hrs closure to place manhole. Excavate 20’L X 20’W X 13’D for new manhole placement.*** | |
TR-ROW-0424-00394 | Complete | 04/09/2024 | 10/05/2024 | Right-of-Way (ROW) | The contractor will be upgrading the bridge lighting for Roger Kestler for the City of Tucson. Sidewalk will be available or pedestrians. ROW Permit, Historic should be included as a reviewer that way we can get it docket. | |
TR-UTL-0424-00851 | Complete | 04/23/2024 | 06/22/2024 | Right-of-Way (ROW) - Utility | Access to manhole/handhole for the State Attorney General Audit | |
TR-ROW-0524-00603 | Complete | 05/22/2024 | 10/17/2024 | Right-of-Way (ROW) | Maintance Permit: possible dig ups, for conduit crushed pipes. At existing Zayo HH locations an extra HH will be place. Begin at STA 0+00, by means pull through, pull fiber along existing Zayo conduits, with 288F micro cable. Place new Zayo HH at STA 1+10. Pull along Alameda St. to E Tools Ave. for approx. 1029' Place Zayo HH at STA 9+70. Resume pulling cable to STA 20+60. Place HH at STA 20+70. Resume pulling cable along existing ducts to STA 30+70. Place Zayo HH at STA 30+80, resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00. | |
TR-ROW-0524-00622 | Denied | 05/23/2024 | N/A | Right-of-Way (ROW) | Maintance Permit: possible dig ups, for conduit crushed pipes. At existing Zayo HH locations an extra HH will be place. Begin at STA 0+00, by means pull through, pull fiber along existing Zayo conduits, with 288F micro cable. Place new Zayo HH at STA 1+10. Pull along Alameda St. to E Tools Ave. for approx. 1029' Place Zayo HH at STA 9+70. Resume pulling cable to STA 20+60. Place HH at STA 20+70. Resume pulling cable along existing ducts to STA 30+70. Place Zayo HH at STA 30+80, resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00. Was originally TR-ROW-0524-00603 | |
TR-ROW-0624-00706 | Void | 06/18/2024 | N/A | Right-of-Way (ROW) | Utility Locates only within the green area of attached aerial images | |
TR-ROW-0624-00706 | Void | 06/18/2024 | N/A | UNIT 152 | Right-of-Way (ROW) | Utility Locates only within the green area of attached aerial images |
TR-ROW-0624-00706 | Void | 06/18/2024 | N/A | UNIT 404 | Right-of-Way (ROW) | Utility Locates only within the green area of attached aerial images |
TR-ROW-0724-00794 | Complete | 07/15/2024 | 08/30/2024 | Right-of-Way (ROW) | Utility locates for prints to be made on upcoming City of Tucson Water Projects,**Use of Ground Penetrating Radar scanning, intersection to be broken down into section while performing work.** . | |
T21RW05014 | Complete | 11/17/2021 | 03/23/2022 | Right-of-Way (ROW) | BORE 60 FEET FROM POLE TO EXISTING VAULT, 2 2 INCH CONDUIT, DEPTH 3 FEET AND PLACE 288ct FIBER IN CO | |
TF-FCP-1124-01007 | Issued | 11/25/2024 | 07/03/2025 | Fire Construction Permit | New Fire Suppression System Install for Kitchen Hood | |
TR-ROW-1124-01371 | Needs resubmittal | 11/26/2024 | N/A | Right-of-Way (ROW) | At existing Zayo HH locations an extra HH will be place. Begin at STA 0+00, by means pull through, pull fiber along existing Zayo conduits, with 288F micro cable. Place new Zayo HH at STA 1+10. Pull along Alameda St. to E Tools Ave. for approx. 1029' Place Zayo HH at STA 9+70. Resume pulling cable to STA 20+60. Place HH at STA 20+70. Resume pulling cable along existing ducts to STA 30+70. Place Zayo HH at STA 30+80, resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00. Maintaince Permit: possible dig ups, for conduit crushed pipes. Archeology permit in process. | |
TF-FCP-1224-01057 | Issued | 12/06/2024 | 06/18/2025 | Fire Construction Permit | NFP to modify the existing fire sprinkler system. | |
TR-ROW-1222-00166 | Complete | 12/16/2022 | N/A | Right-of-Way (ROW) | 24hrs closure to place manhole. Excavate 20’L X 20’W X 13’D for new manhole placement. 6TH Ave & Toole | |
T05OT02540 | Final | 10/12/2005 | 05/15/2006 | SIGN | 9872 | |
T05OT02565 | Withdrwn | 10/14/2005 | N/A | C-OF-O | C OF O:PARENTING ARIZONA | |
T05OT02846 | Final | 11/16/2005 | 12/20/2006 | SIGN | 10069 | |
T06BU01636 | Closed | 06/26/2006 | 01/02/2007 | SPKLR | SPRNKLR: RELOC: 1 HEAD | |
T06OT01657 | Final | 06/21/2006 | 12/20/2006 | SIGN | 11381 | |
T08EX00857 | Closed | 10/22/2008 | 12/21/2008 | EXCAV | EXCAVATION IN SIDEWALK FOR WATER LEAK REPAIR | |
T13CM07461 | C of o | 12/10/2013 | 06/03/2015 | COMBO | TI: OFFICE | |
T13ME00044 | Void | 04/29/2013 | N/A | MECH | like for like unit replacement | |
T14BU00434 | Final | 04/23/2014 | 04/26/2015 | SPKLR | ADD 2, RELOCATE 30 FIRE SPRINKLERS | |
T14BU00536 | Final | 05/22/2014 | 04/07/2015 | BUILD | ALARM | |
T14BU00882 | Final | 08/05/2014 | 07/19/2015 | BUILD | FIRE ALARM | |
T14EX00187 | Closed | 03/13/2014 | 11/11/2014 | EXCAV | Reconfigure the sidewalk areas at building entrances per approved commercial alterations plan T13CM07461. Sidewalk improvements must comply with ADA requierments. | |
T17RW00497 | Final | 01/31/2017 | 03/08/2017 | ROW | ACCESS ONE MANHOLE TO SPLICE FIBERS | |
T17RW01448 | Final | 04/03/2017 | 05/04/2017 | ROW | (3) 5 X 5 IN BLKTOP IN FRONT TO ABANDON GAS LINE | |
T98OT00142 | C of o | 05/27/1998 | 03/23/1999 | C-OF-O | C OF O INSPECTION: |
Code Enforcement
Parcel Number - 117110730
Date - 02/07/2025 10:50 a.m.
Total Number Of Code Cases - 4
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T05FR00182 | Complete | 02/03/2005 | N/A | FIREINSP | Sprinkler repairs needed | |
T06VL00672 | Void | 05/22/2006 | N/A | CODEVIOL | SIGNS WOP - CHECK FRONTAGE AND DISTRICT FOR ALLOWABLE SIGN AREA | |
T09FR01918 | Complete | 06/10/2009 | N/A | FIREINSP | SPRINKLER INSP. | |
T14DV04801 | Complian | 07/15/2014 | N/A | DNR_VIOL | FLOOD IN BASEMENT THAT MAY CAUSE ELECTRICAL HAZZARDS TO REST OF THE BUILDING |