Permit: TR-UTL-0726-01158
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
160 E ALAMEDA ST
Address NEW:
160 E ALAMEDA ST
Apply Date:
07/14/2026
Applicant:
Elita Aguilar
Description:
(1) 4' X 35' TRENCH IN PAVEMENT, WITH AN ADDITIONAL 4' X 34' TRENCH IN PAVEMENT TO INSTALL NEW GAS SERVICE.
Permit Reviews
Permit Number - TR-UTL-0726-01158
Permit Status: Issued
Permit Description: (1) 4' X 35' TRENCH IN PAVEMENT, WITH AN ADDITIONAL 4' X 34' TRENCH IN PAVEMENT TO INSTALL NEW GAS SERVICE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/20/2026 | RIGHT-OF-WAY REVIEW v.3 | 08/20/2026 | APPROVED |
| 08/03/2026 | RIGHT-OF-WAY REVIEW v.2 | 08/20/2026 | REQUIRES RESUBMIT |
| 07/15/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01158
Permit Status: Issued
Permit Description: (1) 4' X 35' TRENCH IN PAVEMENT, WITH AN ADDITIONAL 4' X 34' TRENCH IN PAVEMENT TO INSTALL NEW GAS SERVICE.
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 07/16/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to the Historic Preservation Office, City of Tucson, PO BOX 27210, Tucson AZ 85726...***Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 07/16/2026 | Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell. |
| 07/16/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/16/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/16/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/16/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/23/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 08/20/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |