Address Search: 161 N 6TH AV
Search
Parcel Attributes
| Parcel | 117110730 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | OCR-2 |
| Tucson Ward | Ward 6 |
| Tucson Downtown Incentive Zone | Downtown Infill Incentive District, Downtown Core |
| Rio Nuevo Downtown | Rio Nuevo - Downtown |
| Rio Nuevo Multipurpose Facilities District | Yes |
| Redevelopment | Downtown Redevelopment District |
| Tucson Registered Neighborhood | Downtown |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 161 N 6TH AV
Date - 08/19/2026 12:36 a.m.
Total Number Of Annexations & Original City Zoning (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| Original Town Of Tucson | ORIGINAL |
Permits
Address: 161 N 6TH AV
Date - 08/19/2026 12:36 a.m.
Total Number Of Permits - (4)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T21RW05014 | Complete | 11/17/2021 | 03/23/2022 | Right-of-Way (ROW) | BORE 60 FEET FROM POLE TO EXISTING VAULT, 2 2 INCH CONDUIT, DEPTH 3 FEET AND PLACE 288ct FIBER IN CO | |
| TR-ROW-0925-01162 | Void | 09/22/2025 | N/A | Right-of-Way (ROW) | At existing Zayo HH locations an extra HH will be place. Begin at STA 0+00, by means pull through, pull fiber along existing Zayo conduits, with 288F micro cable. Place new Zayo HH at STA 1+10. Pull along Alameda St. to E Tools Ave. for approx. 1029' Place Zayo HH at STA 9+70. Resume pulling cable to STA 20+60. Place HH at STA 20+70. Resume pulling cable along existing ducts to STA 30+70. Place Zayo HH at STA 30+80, resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00. Maintain Permit: possible dig ups, for conduit crushed pipes. Archeology permit in process. | |
| TR-ROW-0624-00706 | Void | 06/18/2024 | N/A | Right-of-Way (ROW) | Utility Locates only within the green area of attached aerial images | |
| TR-ROW-0424-00394 | Complete | 04/09/2024 | 10/05/2024 | Right-of-Way (ROW) | The contractor will be upgrading the bridge lighting for Roger Kestler for the City of Tucson. Sidewalk will be available or pedestrians. ROW Permit, Historic should be included as a reviewer that way we can get it docket. |