Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 11515010F
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 11/26/2024 7:08 p.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 11515010F
Date - 11/26/2024 7:08 p.m.
Total Number Of Permits - (4)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-ROW-0523-00690 | Complete | 05/02/2023 | 06/16/2023 | Right-of-Way (ROW) | 3 to 4 vertical soil borings within approximately 365 linear feet of North Fairview Avenue. Project limits are from West Grant Road to West Sahuaro Road. Vertical soil borings will be approximately 7 inches in diameter. | |
T16EX01678 | Final | 05/04/2016 | 07/03/2016 | EXCAV | ISSAP ATLAS 0020 (1 LOCATION) - ABANDON/REPLACE/TIE OVER GAS LINES AT VARIOUS LOCATIONS | |
T16TC01084 | Expired | 05/04/2016 | N/A | BARRICAD | ISSAP ATLAS 0020 (1 LOCATION) - ABANDON/REPLACE/TIE OVER GAS LINES AT VARIOUS LOCATIONS | |
T21RW00653 | Final | 02/10/2021 | 03/13/2021 | ROW | (2) 5x5 bellholes in dirt/blktop front---- repair/replace/pothole gas line This project is located in a City of Tucson Archaeological Sensitivity Zone. An archaeological monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. The Arizona State Museum can furnish a list of qualified archaeologists. Please allow up to 30 days for the monitor to obtain a project-specific Arizona Antiquities Act permit before scheduling the work. The existing City of Tucson monitoring and discovery plan for excavation within an Archaeological Sensitivity Zone may be used by the monitor to obtain the permit. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |