Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW)
Address NEW:
2330 N FAIRVIEW AV
Apply Date:
02/12/2026
Applicant:
Alexis Otero-Morales
Description:
**CONTINUATION OF PERMIT TR-ROW-1125-01438** Install waterline 1250’L X 3’W X 5’D. 04/27/2026 - Request for 90 Day Renewal as of 04/28/2026

Permit Reviews

Permit Number - TR-ROW-0226-00189
Permit Status: Issued
Permit Description: **CONTINUATION OF PERMIT TR-ROW-1125-01438** Install waterline 1250’L X 3’W X 5’D. 04/27/2026 - Request for 90 Day Renewal as of 04/28/2026
Start Date Submittal Complete Date Status  
02/12/2026 RIGHT-OF-WAY REVIEW v.1 02/18/2026 REQUIRES RESUBMIT Review Details
02/18/2026 RIGHT-OF-WAY REVIEW v.2 02/20/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0226-00189
Permit Status: Issued
Permit Description: **CONTINUATION OF PERMIT TR-ROW-1125-01438** Install waterline 1250’L X 3’W X 5’D. 04/27/2026 - Request for 90 Day Renewal as of 04/28/2026
Total Outstanding Activity Conditions - 1
Date Name
02/17/2026 CONTINUATION OF PERMIT TR-ROW-1125-01438

Outstanding Inspections

Permit Status: Issued
Permit Number: TR-ROW-0226-00189
Permite Description: **CONTINUATION OF PERMIT TR-ROW-1125-01438** Install waterline 1250’L X 3’W X 5’D. 04/27/2026 - Request for 90 Day Renewal as of 04/28/2026
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
TRSP - ROW - Final N/A Requested

Completed Inspections

Permit Status: Issued
Permit Number: TR-ROW-0226-00189
Permit Description: **CONTINUATION OF PERMIT TR-ROW-1125-01438** Install waterline 1250’L X 3’W X 5’D. 04/27/2026 - Request for 90 Day Renewal as of 04/28/2026
Total Completed Inspections - 3
Date Description Inspector Results Comments
03/04/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
03/16/2026 TRSP - ROW - Barricade - Setup/Routine Passed minor adjustments to help with the bus stops S. Side Eastbound Ln. just passed Fairview. They don’t need any more traffic control on that side of Fairview. They’re shortening it still keeping it safe trafficcade awp is the one making the adjustments. public access and safety.
05/08/2026 TRSP - ROW - Backfill - Placement/Compaction Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
2330 N FAIRVIEW AVE - GRANT RLC PLAN 9 - TR-ROW-1125-01438 - REV 1_V2.PDF DOCUMENTS VIEW
2330 N FAIRVIEW AVE - SITE PLAN- TR-ROW-1125-01438_V1.PDF DOCUMENTS VIEW