Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1113 W GRANT RD
Address NEW:
1113 W GRANT RD
Apply Date:
07/30/2025
Applicant:
ANGEL MORALES
Description:
Performing a tie in into the existing Tucson water waterline at the intersection on flowing wells and grant road. Length will be approx. 20 feet long. 5-10 feet wide and a depth of 5-8 ft. 24HR *** 9/5/25- RENEWAL FOR 30 DAYS AS OF 9/5/25. NEW EXPIRATION DATE IS 10/5/25 9/3/25- RENEWAL FOR 30 DAYS AS OF 9/5/25. NEW EXPIRATION DATE OF 10/5/25

Permit Reviews

Permit Number - TR-UTL-0725-01228
Permit Status: Complete
Permit Description: Performing a tie in into the existing Tucson water waterline at the intersection on flowing wells and grant road. Length will be approx. 20 feet long. 5-10 feet wide and a depth of 5-8 ft. 24HR *** 9/5/25- RENEWAL FOR 30 DAYS AS OF 9/5/25. NEW EXPIRATION DATE IS 10/5/25 9/3/25- RENEWAL FOR 30 DAYS AS OF 9/5/25. NEW EXPIRATION DATE OF 10/5/25
Start Date Submittal Complete Date Status  
09/22/2025 RIGHT-OF-WAY REVIEW REVISION v.1 09/30/2025 REQUIRES RESUBMIT Review Details
08/19/2025 RIGHT-OF-WAY REVIEW REVISION v.2 08/19/2025 APPROVED Review Details
08/07/2025 RIGHT-OF-WAY REVIEW REVISION v.1 08/08/2025 REQUIRES RESUBMIT Review Details
07/31/2025 RIGHT-OF-WAY REVIEW v.1 07/31/2025 APPROVED Review Details

Conditions

Permit Number - TR-UTL-0725-01228
Permit Status: Complete
Permit Description: Performing a tie in into the existing Tucson water waterline at the intersection on flowing wells and grant road. Length will be approx. 20 feet long. 5-10 feet wide and a depth of 5-8 ft. 24HR *** 9/5/25- RENEWAL FOR 30 DAYS AS OF 9/5/25. NEW EXPIRATION DATE IS 10/5/25 9/3/25- RENEWAL FOR 30 DAYS AS OF 9/5/25. NEW EXPIRATION DATE OF 10/5/25
Date Description Comments
07/31/2025 ROW Permit is only allowed for work within City of Tucson Right of Way.
07/31/2025 Traffic control set-up approved: 24 hr
07/31/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0725-01228
Permit Description: Performing a tie in into the existing Tucson water waterline at the intersection on flowing wells and grant road. Length will be approx. 20 feet long. 5-10 feet wide and a depth of 5-8 ft. 24HR *** 9/5/25- RENEWAL FOR 30 DAYS AS OF 9/5/25. NEW EXPIRATION DATE IS 10/5/25 9/3/25- RENEWAL FOR 30 DAYS AS OF 9/5/25. NEW EXPIRATION DATE OF 10/5/25
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/06/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/13/2025 TRSP - ROW - Barricade Takedown Passed
10/13/2025 TRSP - ROW - Final Passed