Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1113 W GRANT RD
Address NEW:
1113 W GRANT RD
Apply Date:
09/05/2025
Applicant:
ANGEL MORALES
Description:
Performing a tie in into the existing Tucson water waterline at the intersection on flowing wells and grant road. Length will be approx. 20 feet long. 5-10 feet wide and a depth of 5-8 ft. 24HR *** Continuation permit TR-UTL-0725-01228.

Permit Reviews

Permit Number - TR-UTL-0925-01506
Permit Status: Complete
Permit Description: Performing a tie in into the existing Tucson water waterline at the intersection on flowing wells and grant road. Length will be approx. 20 feet long. 5-10 feet wide and a depth of 5-8 ft. 24HR *** Continuation permit TR-UTL-0725-01228.
Start Date Submittal Complete Date Status  
09/05/2025 RIGHT-OF-WAY REVIEW v.1 09/30/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0925-01506
Permit Status: Complete
Permit Description: Performing a tie in into the existing Tucson water waterline at the intersection on flowing wells and grant road. Length will be approx. 20 feet long. 5-10 feet wide and a depth of 5-8 ft. 24HR *** Continuation permit TR-UTL-0725-01228.
Total Outstanding Activity Conditions - 3
Date Name
09/08/2025 ROW Permit is only allowed for work within City of Tucson Right of Way.
09/08/2025 The following extended traffic control set-up times were approved:
09/08/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0925-01506
Permit Description: Performing a tie in into the existing Tucson water waterline at the intersection on flowing wells and grant road. Length will be approx. 20 feet long. 5-10 feet wide and a depth of 5-8 ft. 24HR *** Continuation permit TR-UTL-0725-01228.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/15/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
12/29/2025 TRSP - ROW - Paving - Subgrade/removal/placement Passed
12/29/2025 TRSP - ROW - Final Passed