Parcel Search: 11449011C
Parcel Search
Parcel Attributes
| Parcel | 11449011C |
|---|---|
| Jurisdiction | Pima County |
| Flood Related Information | FEMA Floodplain Area |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Parcel Number - 11449011C
Date - 08/19/2026 10:21 a.m.
Total Number Of Permits - (3)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TW-CONS-0326-0004 | Inspections | 03/25/2026 | N/A | TW CIP Planning & Engineering | 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment. | |
| TW-CONS-0726-0081 | Submitted | 07/06/2026 | N/A | TW CIP Planning & Engineering | 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment. | |
| TW-CONS-0726-0082 | Submitted | 07/06/2026 | N/A | TW CIP Planning & Engineering | 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment. |
Plans
Parcel Number - 11449011C
Date - 08/19/2026 10:21 a.m.
Total Number Of Plans - 1
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TW-PLAN-0426-0099 | Approved to construct | 04/15/2026 | N/A | TW CIP Planning & Engineering | 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment. |