Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel11449011C
JurisdictionPima County
Flood Related InformationFEMA Floodplain Area
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Permits

Parcel Number - 11449011C
Date - 08/19/2026 10:21 a.m.
Total Number Of Permits - (3)
Permit Permit Status Entered Date Expired Date Unit Type Description
TW-CONS-0326-0004 Inspections 03/25/2026 N/A TW CIP Planning & Engineering 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.
TW-CONS-0726-0081 Submitted 07/06/2026 N/A TW CIP Planning & Engineering 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.
TW-CONS-0726-0082 Submitted 07/06/2026 N/A TW CIP Planning & Engineering 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.

Plans

Parcel Number - 11449011C
Date - 08/19/2026 10:21 a.m.
Total Number Of Plans - 1
Plan Number Plan Status Application Date Expired Date Unit Type Description
TW-PLAN-0426-0099 Approved to construct 04/15/2026 N/A TW CIP Planning & Engineering 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.