Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Details

Status:
Approved to construct
Type:
TW CIP Planning & Engineering
Apply Date:
04/15/2026
Applicant:
Kyle
Description:
24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.
Architects:
  • Borderland
  • Tricon Contracting Inc.
  • Tricon Contracting, Inc.
  • Tucson Water Planning & Engineering
  • WestLand Engineering and Environmental Services, Inc.
Contractors:

Plan Reviews

Plan Number - TW-PLAN-0426-0099
Plan Status: Approved to Construct
Plan Description: 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.
Start Date Submittal Complete Date Status  
06/24/2026 TWPE 100% Design Plan Approval v.1 APPROVED Review Details