Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel11449011C
JurisdictionPima County
Flood Related InformationFEMA Floodplain Area
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Permits

Address: 2970 N PANTANO RD
Date - 11/11/2026 4:45 p.m.
Total Number Of Permits - (2)
Permit Status Apply Date Expired Date Unit Type Description
TW-CONS-0726-0082 Complete 07/06/2026 N/A TW CIP Planning & Engineering Refer To TW-CONS-0326-0004
TW-CONS-0326-0004 Inspections 03/25/2026 N/A TW CIP Planning & Engineering 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.

Plans

Address: 2970 N PANTANO RD
Date - 11/11/2026 4:45 p.m.
Total Number Of Plans - (1)
Plan Number Status Application Date Exp Date Unit Type Description
TW-PLAN-0426-0099 Approved to Construct 04/15/2026 N/A -- TW Capital Plan 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.