Permit: TW-CONS-0326-0004
Permit Details
Status:
Inspections
Type:
TW CIP Planning & Engineering
Address:
2970 N PANTANO RD
Address NEW:
2970 N PANTANO RD
Apply Date:
03/25/2026
Applicant:
Al heimpel
Description:
24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.
Outstanding Inspections
Permit Status: Inspections
Permit Number: TW-CONS-0326-0004
Permite Description: 24" Emergency Transmission Main Replacement along the Sabino Wash.
Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project.
Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project.
Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| TWPE Daily Field Inspection | N/A | Scheduled | ||
| TWPE Summary review of Daily Field Inspections | N/A | Scheduled |
Completed Inspections
Permit Status: Inspections
Permit Number: TW-CONS-0326-0004
Permit Description: 24" Emergency Transmission Main Replacement along the Sabino Wash.
Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project.
Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project.
Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2026 | TWPE Pressure & Disinfection Testing | Passed | project 100% complete |
Scheduled Inspections
Scheduled Inspections - TW-CONS-0326-0004
Status: Inspections
Description: 24" Emergency Transmission Main Replacement along the Sabino Wash.
Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project.
Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project.
Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 08/18/2026 | TWPE Summary review of Daily Field Inspections | Scheduled | |
| 08/18/2026 | TWPE Daily Field Inspection | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.