Permit Details

Status:
Inspections
Type:
TW CIP Planning & Engineering
Address NEW:
2970 N PANTANO RD
Apply Date:
03/25/2026
Applicant:
Al heimpel
Description:
24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TW-CONS-0326-0004
Permite Description: 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
TWPE Daily Field Inspection N/A Scheduled
TWPE Summary review of Daily Field Inspections N/A Scheduled

Completed Inspections

Permit Status: Inspections
Permit Number: TW-CONS-0326-0004
Permit Description: 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.
Total Completed Inspections - 1
Date Description Inspector Results Comments
06/01/2026 TWPE Pressure & Disinfection Testing Passed project 100% complete

Scheduled Inspections

Scheduled Inspections - TW-CONS-0326-0004
Status: Inspections
Description: 24" Emergency Transmission Main Replacement along the Sabino Wash. Phase 1 – Install a new 24-inch gate valve on the south embankment side of the project. Phase 2 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP on the south embankment side of the project. Phase 3 – Remove the existing 24-inch HDPE pipeline and install new 24-inch DIP along Sabino Wash and on the north embankment side of the project, tying into the existing 24-inch gate valve (N-2482379) at the top of the north embankment.
Scheduled Date Description Entered By Entered Date
08/18/2026 TWPE Summary review of Daily Field Inspections Scheduled
08/18/2026 TWPE Daily Field Inspection Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .