Parcel Search: 10409019B
Parcel Search
Parcel Attributes
| Parcel | 10409019B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street+culvert |
| City of Tucson Zoning | MU |
| Tucson Ward | Ward 3 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/19/2026 9:05 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 10409019B
Date - 08/19/2026 9:05 a.m.
Total Number Of Permits - (5)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-0425-00524 | Complete | 04/18/2025 | 05/31/2025 | Right-of-Way (ROW) | PJW252 Short Main Replacement utility potholing using air/vacuum excavation. | |
| TW-CONS-0626-0080 | Inspections | 06/30/2026 | N/A | TW CIP Planning & Engineering | Opportunistic Short Main Replacement of ~200' of a 2" Galvanized Pipe ahead of a DTM pavement project. Waiting on 100% signatures - 5/19, Still waiting on DTM signatures 6/1/26 invitation to bid was sent out - 6/5. Due date is 6/22 Bid winner announced - Action pipe line, NOIA was sent, WAF created waiting on PO to send NTP and Construction permit. Contractor wants to start Aug. 1st | |
| TR-ROW-0726-00832 | Inspections | 07/21/2026 | 10/03/2026 | Right-of-Way (ROW) | tying in new 4in waterline in north sidewalk in ROW. replacement of existing sidewalk to be inspected by COT ROW inspector | |
| TR-UTL-1025-01797 | Void | 10/15/2025 | N/A | Right-of-Way (ROW) - Utility | wo#3141713 850 w limberlost dr 13-13-23 se leaking main at the east side of the lot in asphalt 35lf/ar | |
| T20CM07532 | Expired | 10/30/2020 | N/A | 925 | Residential Building - One or Two Family | Gas Line Repair |
Plans
Parcel Number - 10409019B
Date - 08/19/2026 9:05 a.m.
Total Number Of Plans - 1
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TW-PLAN-0426-0079 | Review complete | 04/03/2026 | N/A | TW CIP Planning & Engineering | Opportunistic Short Main Replacement of ~200' of a 2" Galvanized Pipe ahead of a DTM pavement project. Waiting on 100% signatures - 5/19, Still waiting on DTM signatures 6/1/26 invitation to bid was sent out - 6/5. Due date is 6/22 Bid winner announced - Action pipe line, NOIA was sent, WAF created waiting on PO to send NTP and Construction permit. Contractor wants to start Aug. 1st Pre con was done - Project in construction 8/4 |