Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel10409019B
JurisdictionTucson, Pima County
Water Course

Street+culvert

City of Tucson ZoningMU
Tucson WardWard 3
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 858 W LIMBERLOST DR
Date - 08/19/2026 8:31 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-15-04 Limberlost and Fairview Annexation District 11308

Permits

Address: 858 W LIMBERLOST DR
Date - 08/19/2026 8:31 a.m.
Total Number Of Permits - (4)
Permit Status Apply Date Expired Date Unit Type Description
T20CM07532 Expired 10/30/2020 N/A 925 Residential Building - One or Two Family Gas Line Repair
TR-ROW-0726-00832 Inspections 07/21/2026 10/03/2026 Right-of-Way (ROW) tying in new 4in waterline in north sidewalk in ROW. replacement of existing sidewalk to be inspected by COT ROW inspector
TW-CONS-0626-0080 Inspections 06/30/2026 N/A TW CIP Planning & Engineering Opportunistic Short Main Replacement of ~200' of a 2" Galvanized Pipe ahead of a DTM pavement project. Waiting on 100% signatures - 5/19, Still waiting on DTM signatures 6/1/26 invitation to bid was sent out - 6/5. Due date is 6/22 Bid winner announced - Action pipe line, NOIA was sent, WAF created waiting on PO to send NTP and Construction permit. Contractor wants to start Aug. 1st
TR-ROW-0425-00524 Complete 04/18/2025 05/31/2025 Right-of-Way (ROW) PJW252 Short Main Replacement utility potholing using air/vacuum excavation.

Plans

Address: 858 W LIMBERLOST DR
Date - 08/19/2026 8:31 a.m.
Total Number Of Plans - (1)
Plan Number Status Application Date Exp Date Unit Type Description
TW-PLAN-0426-0079 Review Complete 04/03/2026 N/A -- TW Capital Plan Opportunistic Short Main Replacement of ~200' of a 2" Galvanized Pipe ahead of a DTM pavement project. Waiting on 100% signatures - 5/19, Still waiting on DTM signatures 6/1/26 invitation to bid was sent out - 6/5. Due date is 6/22 Bid winner announced - Action pipe line, NOIA was sent, WAF created waiting on PO to send NTP and Construction permit. Contractor wants to start Aug. 1st Pre con was done - Project in construction 8/4