Permit: TC-COM-0226-00251
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
1625 N CAMPBELL AV
Address NEW:
1625 N CAMPBELL AV
Apply Date:
02/20/2026
Applicant:
Peter Strunk
Description:
Tenant Improvement within existing shell space of Banner University Medical Center Tucson - Tower 2 Level 5
Permit Reviews
Permit Number - TC-COM-0226-00251
Permit Status: Inspections
Permit Description: Tenant Improvement within existing shell space of Banner University Medical Center Tucson - Tower 2 Level 5
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/26/2026 | COMMERCIAL REVIEW - FULL v.1 | 03/19/2026 | APPROVED |
| 03/19/2026 | ADMINISTRATIVE v.1 | 03/19/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0226-00251
Permit Status: Inspections
Permit Description: Tenant Improvement within existing shell space of Banner University Medical Center Tucson - Tower 2 Level 5
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/19/2026 | AIR BALANCING REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0226-00251
Permit Status: Inspections
Permit Description: Tenant Improvement within existing shell space of Banner University Medical Center Tucson - Tower 2 Level 5
| Date | Description | Comments |
|---|---|---|
| 02/24/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/26/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0226-00251
Permite Description: Tenant Improvement within existing shell space of Banner University Medical Center Tucson - Tower 2 Level 5
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2026 | COT - LCBU - Framing | N/A | Partial Pass | 6/8/26: Phase 1 framing per approved plans. Ok to proceed with insulation and MEP. |
| 06/08/2026 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 6/8/26: Phase 1 electrical in wall approved. |