Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: TP-ENT-1224-00026
Parcel: 12213065C

Review Status: Requires Resubmit

Review Details: ENTITLEMENT REVIEW v.4

Plan Number - TP-ENT-1224-00026
Review Name: ENTITLEMENT REVIEW v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Entitlement Review Coordinator Express PENDING ASSIGNMENT
Entitlements PENDING ASSIGNMENT
External Reviewers - Arizona Department of Transportation (ADOT) PENDING ASSIGNMENT
External Reviewers - AZ State Land PENDING ASSIGNMENT
External Reviewers - COT Environmental Services PENDING ASSIGNMENT
External Reviewers - COT Parks & Recreation PENDING ASSIGNMENT
External Reviewers - Davis Monthan AFB PENDING ASSIGNMENT
External Reviewers - PC RFCD PENDING ASSIGNMENT
External Reviewers - Pima Association of Governments PENDING ASSIGNMENT
External Reviewers - Pima County Addressing PENDING ASSIGNMENT
External Reviewers - Pima County Assessor PENDING ASSIGNMENT
External Reviewers - Pima County Development Services PENDING ASSIGNMENT
External Reviewers - Pima County Natural Resources PENDING ASSIGNMENT
External Reviewers - Pima County Transportation PENDING ASSIGNMENT
External Reviewers - Pima County Wastewater (RWRD) PENDING ASSIGNMENT
External Reviewers - Tohono Oodham PENDING ASSIGNMENT
External Reviewers - Tucson Airport Authority PENDING ASSIGNMENT
External Reviewers - Tucson Electric Power (TEP) PENDING ASSIGNMENT
External Reviewers - Tucson Unified School District (TUSD) PENDING ASSIGNMENT
Fire New Construction PENDING ASSIGNMENT
Historic PENDING ASSIGNMENT
Real Estate PENDING ASSIGNMENT
ROW Engineering Review PENDING ASSIGNMENT
Signs PENDING ASSIGNMENT
Site Engineering PENDING ASSIGNMENT
Site Landscape PENDING ASSIGNMENT
Site Zoning PENDING ASSIGNMENT
Streetcar Track Access Review PENDING ASSIGNMENT
Sun Tran Review PENDING ASSIGNMENT
Transportation - Bike/Ped PENDING ASSIGNMENT
Transportation Landscape Review PENDING ASSIGNMENT
Tucson Water New Area Development PENDING ASSIGNMENT
IPC - Entitlements REQUIRES RESUBMIT Please revise Introduction and Policy to reflect the required process for approval. This request requires both an approved Zoning Examiner Special Exception and approval by the Board of Adjustments.

The Zoning Examiner has the authority to apply conditions to minimize potentially injurious effects on adjacent properties. The request for a wall exceeding the allowable height and for reduced setbacks is not within the powers granted to the Zoning Examiner. Reducing the setback to zero feet or increasing the height of the wall outside of the allowed range potentially impact neighboring properties to a greater extent. The Zoning Examiner can impose conditions which minimize the negative impact of a development, but now vary standards which would increase the negative impact.

The Board of Adjustments can allow a variance for a standard that exists across all zones and that could not be resolved through a rezoning action.
IPC - Site Engineering REQUIRES RESUBMIT See Entitlements comments.
IPC - Site Zoning REQUIRES RESUBMIT Please revise Introduction and Policy to reflect the required process for approval. This request requires both an approved Zoning Examiner Special Exception and approval by the Board of Adjustments.

The Zoning Examiner has the authority to apply conditions to minimize potentially injurious effects on adjacent properties. The request for a wall exceeding the allowable height and for reduced setbacks is not within the powers granted to the Zoning Examiner. Reducing the setback to zero feet or increasing the height of the wall outside of the allowed range potentially impact neighboring properties to a greater extent. The Zoning Examiner can impose conditions which minimize the negative impact of a development, but now vary standards which would increase the negative impact.

The Board of Adjustments can allow a variance for a standard that exists across all zones and that could not be resolved through a rezoning action.
IPC - Fire New Construction REVIEW COMPLETED
IPC - Traffic Engineering REVIEW COMPLETED No comments or concerns from DTM Traffic Engineering Division. Per submittal materials, there will generally be 1-2 trips to the site per month.