Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T21CM09453
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/09/2023 | External Reviewers - SAFEBuilt | APPROVED | Activity Number: T21CM09453 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved EL1.1C 1ST FLOOR LIGHTING PLAN SOUTH BLDG SECTOR C: Missing Keynote #7. EL1.1D 1ST FLOOR LIGHTING PLAN SOUTH BLDG SECTOR D: Missing Keynote #7. EL6.1 LIGHT FIXTURE SCHEDULES: CAD or pdf formatting issue, Light pole detail missing side of pole and some text unreadable. EP6.1 PANEL SCHEDULES: CAD or pdf formatting issue, Panel schedule difficult to read. PLUMBING REVIEW COMMENTS: Conditionally Approved Plumbing Revision Plan Review: Ok Subject to field inspections Courtyard sinks on plan pages P3.4, 4.1, 4.4 will need to be protected from receiving rain water -IPC 1101.3 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
05/16/2023 | Site Engineering | APPROVED | |||
05/18/2023 | Site Zoning | APPROVED | |||
05/18/2023 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
05/10/2023 | Fire New Construction | REVIEW COMPLETED | |||
04/24/2023 | PDSD Application Completeness | REVIEW COMPLETED |